Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [10GMMF] task2 & task4 launch study summary of progress draft revision1




Dear Launch study participants 

As discussed by the group today I've revised the summary of the launch
study group ; the 3 options for the launch recommendations have been
sent separately in an earlier e-mail-I have left them off this slide set
to save on file size 

feedback very welcome, ASAP 
thanks for the input from all into today's call
best wishes

 Jonathan
  
tel: 1 408 524 5110
e-mail: jking@bigbearnetworks.com
fax: 1 408 739 0568

Jonathan King
Director, Optical Systems
BigBear Networks
345 Potrero Avenue
Sunnyvale, CA 94085

Task2&4-sum-Jan19-05-rev1.ppt