Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [10GMMF] task2 & task4 launch study table of launch recs rev 0.4




With attachment !
As discussed by the group today I've revised the single table into 3
options as proposed by David Cunningham and agreed by those on the call
includes 6um radius spec for OM1 as proposed by Joerg, and an attempt at
an advisory sentence in note 2 as proposed by Lew

feedback very welcome, ASAP 
thanks for the input from all into today's call
best wishes

 Jonathan
  
tel: 1 408 524 5110
e-mail: jking@bigbearnetworks.com
fax: 1 408 739 0568

Jonathan King
Director, Optical Systems
BigBear Networks
345 Potrero Avenue
Sunnyvale, CA 94085

DraftLaunch-recomm-rev0-4.ppt