Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802.3_B10GAUTO] P802.3cy September 21st and 28th Interim meetings call for presentations



Hi P802.3cy participants,

Please send requests to present at the September P802.3cy Interim meetings as requested below.

Please include the following information with all requests:

  • Name of presenter
  • Title of presentation
  • Length of time requested (this should include time for questions and answers)
  • Brief description of topic

In addition to requests for presentation, all Straw Poll requests and Motion requests that are not part of a presentation should be sent by the presentation deadline so they can be preloaded.

Tuesday, Sept. 21st:  Send request by 3 pm EDT on Sept. 17th.  Please send at least a draft of your presentation by this time as well so participants have time to review before the meeting.  An update can always be provided on Monday or during the meeting on Tuesday, the 21st.

Tuesday, Sept. 28th:  Send request by 3 pm EDT on Sept. 22nd.  Presentations are due by 3 pm EDT on Sept. 24th.

The following are the September 21st presentations from the to-do list.  

MOTION - Signaling Type and Modulation - Ragnar Jonsson, Hossein Sedarat, Mike Tu, ...

PCS Issues for laning - George Zimmerman

residual echo (micro-reflection) parameters - Ragnar Jonsson


The following are the September 28th presentations from the to-do list.

MOTION - Link Segment Screening/Coupling Attenuation - Thomas Mueller

MOTION - PCB IL Limit and test fixture definition - Kadry & DiMinico

EMC ingress immunity through shield - Rich Boyer

As always, presentations on other topics are welcome.

Thanks,

Natalie Wienckowski
General Motors
P802.3cy ad hoc Chair

Steve Carlson
High Speed Design, Inc.
P802.3cy Chair



To unsubscribe from the STDS-802-3-B10GAUTO list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-B10GAUTO&A=1