Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Folks, Please let me know if I need to revise or add to the notes below.
Have a great weekend! Curtis 09/03/2015 IEEE 802.3 NG-EPON Study Group Work Items and Socialization Meeting Start: Meeting End:
·
Review of Guidelines for IEEE-SA meetings.
o
https://development.standards.ieee.org/myproject/Public/mytools/mob/preparslides.pdf
o
Has anyone not seen these Guidelines?
Everyone has seen the guidelines
·
CSD/PAR/Objectives timeline
o
Submit Objectives, CSD, and PAR by Oct 9 to meet the 30-day EC distribution requirement
o
Refinement at the plenary by the Study Group of something we vote to approve in good faith at the September interim is just fine, within reason. Absolutely minimize the changes made to the PAR, minimal
changes to the CSD, but additional objectives can be added.
o
Goal at end of September interim – approval CSD/PAR/Objectives
·
Study Group Objectives
o
Review Current version (R07) located here:
§
https://owncloud.cablelabs.com/public.php?service=files&t=4951cd9a35045bade1c1b0729eecaac0
o
Comments on current objectives:
§
“Provide physical layer specifications operating over a single SMF strand and supporting” makes it sound as if the said specifications operate over SMF, which is clearly not the intent.
I would suggest the following wording instead: “Provide physical layer specifications for operation over a single SMF strand and supporting”
·
Provide specifications for physical layers operating over a single SMF strand and supporting
§
“MAC data rate” is repeated in three 2nfd level bullets. Suggest to change “supporting” to “supporting the MAC data rate of:” and strike ‘MAC data rate of’ in three 2nd level
bullets
§
“Provide an extensible architecture that will support future higher MAC data rates of at least 100 Gb/s” – we do not “provide” architecture, but rather define it in the spec. There
is also no need to state “higher” since it is implied by 100 Gb/s target already. Suggest to reword as follows: “Define an extensible architecture to support future MAC data rates of at least 100 Gb/s”
o
Regarding objective #3 (from R07):
§
Provide an extensible architecture that will support future higher MAC data rates of at least 100 Gb/s
§
Can we socialize this objective with other .3 WG members to get feedback? We should avoid surprises.
o
Co-existence objective proposal:
§
Support coexistence with 10G-EPON
·
Power budgets equivalent to 10G-EPON power budgets defined in 802.3-2015
·
Wavelength allocation allowing concurrent operation with 10G-EPON PHYs
o
Version R08 has been posted here:
https://owncloud.cablelabs.com/public.php?service=files&t=4951cd9a35045bade1c1b0729eecaac0
·
PAR Scope and Purpose contribution – Duane
o
Review the document “201509Remein_NG-EPON Project Scope Purpose.pdf” located here:
https://owncloud.cablelabs.com/public.php?service=files&t=4951cd9a35045bade1c1b0729eecaac0
o
Purpose: Looks good for now.
o
Scope: The scope of this project is to amend IEEE Std 802.3 to add physical layer specifications and management parameters for symmetric and/or asymmetric operation supporting at least 25 Gb/s and
at least 40 Gb/s MAC data rate on point-to-multipoint passive optical networks. Also to define an extensible architecture that will support future higher MAC data rates of at least 100 Gb/s.
(this last sentence may need to be modified according to any changes in our objectives)
o
There is another section in PAR – “Need for project” – that also needs updated.
o
Duane to update presentation, ready for next week.
o
This information will be pulled into a draft PAR for discussion at the Bonita Springs meeting.
·
CSD Discussion
o
Review documents “NG-EPON 5Criteria - R01.pptx” and “201509Remein_NG-EPON ad hoc summary and CSDs.pptx” located here:
§
https://owncloud.cablelabs.com/public.php?service=files&t=4951cd9a35045bade1c1b0729eecaac0
o
Slides will be updated for next meeting based on discussion.
·
Reminder - Call for Contributions
o
First Study Group meeting is:
§
September 14-15, 9:00 am – 5:00 pm
o
Contribution deadline: September 4, 2015 AOE
o
Send initial
draft PDF and indicate amount of time desired
to c.knittle@xxxxxxxxxxxxx
·
Contributions needed
o
·
Miscellaneous
o
Table 1: Attendees
Curtis Knittle Director, Optical Technologies CableLabs 858 Coal Creek Circle Louisville, CO 80027 Office: 303-661-3851 Mobile: 303-589-6869 Email:
c.knittle@xxxxxxxxxxxxx |