Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
All – Now that the project documentation from the Greater than 10 Mb/s long-reach SPE point to point study group is complete, we have a project – 802.3dg – focused on 100 Mb/s at long reach. Our first meeting as a task force will be on May 25,
from 7 to 9 am pacific (1400 UTC if I have that right), where we will do the usual first-meeting business. With this email, I am also soliciting contributions. It would be useful to get some contributions on use cases and link segment configurations & possible specifications. That way we can start to give folks a basis for PHY baseline proposals. Please see
https://www.ieee802.org/3/GT10MSPE/index.html for the project documentation. I will let you know when the web page is set up. George Zimmerman, Ph.D. President & Principal CME Consulting, Inc. Experts in Advanced PHYsical Communications 310-920-3860 To unsubscribe from the STDS-802-3-SPEP2P list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-SPEP2P&A=1 |