Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Yan
With regard to your question on the 8B6T+PR and minimum distance and the quick simulation you did.
In your example in Excel you have a problem with the initial conditions. Your first transmit ternary 6T symbol is as follows:
TX 6T sequence with disparity
An Bn Cn Dn En Fn
-1 0 0 1 -1 1
And your first Rx Quinary 6T symbol is as follows:
RX Quinary sequence with 1+D channel
An Bn Cn Dn En Fn
-1 -1 0 1 0 0
So you have assumed that the value of the TX 6T Fn at time before 0, e.g. (time -1) is 0. However, the previous symbol cannot end in zero. So the value of An for your first Rx Quinary 6T symbol must be 0 or -2. Not -1.
Brian
To unsubscribe from the STDS-802-3-SPEP2P list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-SPEP2P&A=1 |