* * *
P802.3bt 4-Pair Power over Ethernet (4PPoE)
* * *
July 2015 Meeting Material
July 14 - 16, Waikoloa, HI
* * *



Title Size/File Date Author(s) Affiliation

All Files 12MB/23-July-2015







Meeting Agenda 495KB/13-July-2015 Chad Jones Cisco Systems, Inc.






Connection Check & Detection Sequencing & Timing 761KB/16-July-2015 Chris Bullock
Dylan Walker
David Abramson
Cisco Systems, Inc.
Cisco Systems, Inc.
Texas Instruments

Only PD affects PD POWERUP Tinrush max 412KB/11-July-2015 Yair Darshan Microsemi

Type 3/4 PSEs Inrush_max value with Type 1/2 PDs 147KB/11-July-2015 Yair Darshan Microsemi

Overload on 4-Pair PSE 178KB/13-July-2015 Christian Beia ST Microelectronics

PSE PI P2PIunb Infrastructure requirements completion 285KB/11-July-2015 Yair Darshan Microsemi

PSE State Diagram Update 520KB/11-July-2015 Dan Dove DNS for LTC

Analysis of Type 3 and 4 PD Cport_max to be supported by PSE Iinrush_min 454KB/11-July-2015 Yair Darshan Microsemi

Is 180uF Enough? 177KB/13-July-2015 Dave Dwelley Linear Technology

Dual Signature Classification 112KB/11-July-2015 Lennart Yseboodt
Matthias Wendt
Philips
Philips

Baseline text for dual signature classification, version 120 251KB/11-July-2015 Lennart Yseboodt Philips

PD PI & 57V 360KB/16-July-2015 Chris Bullock
Dylan Walker
Cisco Systems, Inc.
Cisco Systems, Inc.

Type 4: Class range 270KB/13-July-2015 Lennart Yseboodt
Matthias Wendt
Philips
Philips

Analysis of Table 33-18 item 9, Cpd_min value for Type 3 and 4 PDs 140KB/11-July-2015 Yair Darshan Microsemi

Consideration on Single load and Dual load PD 521KB/16-July-2015 Yan Zhuang
Rui Hua
Huawei Technologies
Huawei Technologies

PSE AC Disconnection 271KB/13-July-2015 Christian Beia ST Microelectronics

Retirement of AC MPS 116KB/11-July-2015 Lennart Yseboodt
Matthias Wendt
Yair Darshan
Philips
Philips
Microsemi

Baseline for AC and DC disconnect P802.3bt D1.1 v100 152KB/11-July-2015 Lennart Yseboodt Philips

PSE Measurement Baseline 492KB/11-July-2015 Yan Zhuang
Shiyong Fu
Huawei Technologies
Huawei Technologies

PD Measurement Baseline 503KB/11-July-2015 Yan Zhuang
Shiyong Fu
Huawei Technologies
Huawei Technologies

Autoclass Text (PSE measurement method - V120) 76KB/14-July-2015 Lennart Yseboodt Philips






Impact of proposed modifications in draft
NEC 2017 on Premises Powering of
Communications Equipment over
Communications Cables
769KB/11-July-2015 Masood Shariff
Valerie Maguire
George Zimmerman
Commscope
Siemon
CME Consulting

SPI/UL Cable Heating Study 3MB/11-July-2015 Fred Dawson The Chemours Company






TR42 Correspondance 268KB/13-July-2015












For comment 15 - yseboodt_Table_33_3.pdf 21KB/2-July-2015 Lennart Yseboodt Philips

For comment 113 et al - darshan_05_0715-REV003.docx 31KB/15-July-2015 Yair Darshan Microsemi

For comment 140 et al - darshan_06_0715-REV008.docx 171KB/15-July-2015 Yair Darshan Microsemi

For comment 137 - darshan_04_0715-REV007A.pdf 138KB/15-July-2015 Yair Darshan Microsemi

for comment 89 - baseline_mps_ac_v101.pdf 152KB/14-July-2015 Lennart Yseboodt Philips

For motion 4: dual_sig_classification_baseline_v124.pdf 246KB/15-July-2015 Lennart Yseboodt Philips

For motion 6: PD Measurement Baseline v2.pdf 472KB/16-July-2015 Yan Zhuang Huawei

For motion 6: PSE Measurement Baseline v2.pdf 472KB/16-July-2015 Yan Zhuang Huawei






Motions and Straw Polls, Aggregated 37KB/16-July-2015 Chad Jones Cisco Systems, Inc.






Minutes (approved Sept 15, 2015) 842KB/22-July-2015 Len Stencel Bourns



Return to the 4PPoE Public Area
Last Update: 18-September-2015


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]