Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
All,
I would like to suggest a motion for the wavelength plan. This is an update of my presentation from Orlando, reflecting the wavelength shift.
•
Wavelength plan
–
Channel A: 1358±1.5nm down, 1300±10nm
up
•
WDM coexistence with 10GE-PON
–
Channel B: 1335±1.5nm down, 1270±10nm
up
•
WDM coexistence with G-PON
•
25 and 50G TDM coexist on both A and B
–
25/10G ONUs would use same upstream as 25/25
•
100G system would be A+B
Frank E. From: Curtis Knittle [mailto:C.Knittle@xxxxxxxxxxxxx]
Dear Colleagues, This serves as a friendly reminder that the 802.3ca Task Force will meet for a third day today, room 15, CICG, starting at 9 am. Thank you, Curtis Curtis Knittle VP Wired Technologies – R&D CableLabs desk: +1-303-661-3851 mobile: +1-303-589-6869 Stay up to date with CableLabs: Read the blog and
follow us on Twitter |