General Information |
|||
Agenda list of presentations here |
11-September-2019 | Kent Lusted | Intel |
Editor's Report | 10-September-2019 | Matt Brown | Independent |
Unapproved Minutes | TBD | Shawn Nicholl Kent Lusted |
Xilinx Intel |
Liaison Letters |
Contributed Presentations - Grouped by Topic (Not presentation Order) |
|||
Examples of C2C Channels with Impairments 10dB 16dB 18dB 20dB Test Cases | 11-September-2019 | Rick Rabinovich | Keysight Technologies |
Baseline Proposal for “100 Gb/s, 200 Gb/s, and 400 Gb/s Chip-to-Chip Attachment Unit Interface |
11-September-2019 | Mike Peng Li Ali Ghiasi |
Intel Ghiasi Quantum |
106Gbps C2C COM Investigation (II) | 4-September-2019 | Mike Peng Li Hsinho Wu Masashi Simanouchi |
Intel |
C2C COM Simulation | 12-September-2019 | Ali Ghiasi | Ghiasi Quantum |
C2M COM Analysis on short and long channels | 12-September-2019 | Ali Ghiasi | Ghiasi Quantum |
Host to Module Short Channel Issue and Possible Solutions | 11-September-2019 | Mau-Lin Wu Pei-Rong Li |
MediaTek |
Comparison of C2M performance at TP1a with whole channel performance | 4-September-2019 | Mike Dudek Tao Hu |
Marvell |
C2M TP1a Criteria Considering Both Long and Short Host Traces | 12-September-2019 | Phil Sun | Credo |
CR Vmin and Vf Decisions | 12-September-2019 | Rich Mellitz | Samtec |
CA COM parameters SNR_TX and ETA_0 Baseline Proposal | 11-September-2019 | Rich Mellitz | Samtec |
Representing imperfections for CR Host Board | 11-September-2019 | Liav Ben-Artsi | Marvell |
100G CR End-to-End Channel Analysis Update (II) | 11-September-2019 | Jane Lim Arturo Pachon Pirooz Tooyserkani |
Cisco |
FEC Latency and Power/Area Tradeoffs for 100G KR/CR | 4-September-2019 | Ilya Lyubomirsky Vlad Shvydun Arash Farhoodfar Jamal Riani |
Inphi |
Summary of Error Propagation for 100GBASE-KR1/CR1 | 4-September-2019 | Yan Zhuang Yuchun (Louis) Lu |
Huawei |
Auto-Negotiation for Dual mode FEC | 4-September-2019 | Yan Zhuang Yuchun (Louis) Lu |
Huawei |
100GBASE-KR1/CR1 FEC Thoughts | 11-September-2019 | Mark Gustlin | Cisco |
ERL KR Baseline Proposal | 11-September-2019 | Rich Mellitz | Samtec |
Backplane Reference Rx Tap Weight Data | 4-September-2019 | Howard Heck Subas Bastola Femi Akinwale Cesar Mendez-Ruiz Jingbo Li |
Intel |
ERL Investigations for Ethernet 106G Backplane (II) | 4-September-2019 | Mike Peng Li Hsinho Wu Masashi Shimanouchi |
Intel |
Late Contributions |
|||
Module on-die termination model | 12-September-2019 | Mark Kimber Ed Frlan Bill Kirkland |
Semtech |
Baseline Proposal for “100 Gb/s, 200 Gb/s, and 400 Gb/s Chip-to-Chip Attachment Unit Interface based on floor feedback 11-Sept 257pm |
11-September-2019 | Mike Peng Li Ali Ghiasi |
Intel Ghiasi Quantum |
3ck Next Steps |
12-September-2019 | Kent Lusted | Intel |
CR Baseline Proposal Considerations at Compliance Points |
12-September-2019 | Chris Diminico | MC Communications/PHI-SI LLC/Panduit |