IEEE P802.3ck Task Force Meeting Page


Meeting Materials for:
Interim Meeting
Week of September 11-12, 2019
Indianapolis, IN, USA

Download all initial meeting materials here: Loaded 13:03 4-September-2019

General Information

Agenda
list of presentations here
11-September-2019 Kent Lusted Intel
Editor's Report 10-September-2019 Matt Brown Independent
Unapproved Minutes TBD Shawn Nicholl
Kent Lusted
Xilinx
Intel


Liaison Letters

Contributed Presentations - Grouped by Topic (Not presentation Order)

Examples of C2C Channels with Impairments 10dB 16dB 18dB 20dB Test Cases 11-September-2019 Rick Rabinovich Keysight Technologies
Baseline Proposal for “100 Gb/s, 200 Gb/s, and 400 Gb/s Chip-to-Chip Attachment Unit Interface
11-September-2019 Mike Peng Li
Ali Ghiasi
Intel
Ghiasi Quantum
106Gbps C2C COM Investigation (II) 4-September-2019 Mike Peng Li
Hsinho Wu
Masashi Simanouchi
Intel
C2C COM Simulation 12-September-2019 Ali Ghiasi Ghiasi Quantum
C2M COM Analysis on short and long channels 12-September-2019 Ali Ghiasi Ghiasi Quantum
Host to Module Short Channel Issue and Possible Solutions 11-September-2019 Mau-Lin Wu
Pei-Rong Li
MediaTek
Comparison of C2M performance at TP1a with whole channel performance 4-September-2019 Mike Dudek
Tao Hu
Marvell
C2M TP1a Criteria Considering Both Long and Short Host Traces 12-September-2019 Phil Sun Credo
CR Vmin and Vf Decisions 12-September-2019 Rich Mellitz Samtec
CA COM parameters SNR_TX and ETA_0 Baseline Proposal 11-September-2019 Rich Mellitz Samtec
Representing imperfections for CR Host Board 11-September-2019 Liav Ben-Artsi Marvell
100G CR End-to-End Channel Analysis Update (II) 11-September-2019 Jane Lim
Arturo Pachon
Pirooz Tooyserkani
Cisco
FEC Latency and Power/Area Tradeoffs for 100G KR/CR 4-September-2019 Ilya Lyubomirsky
Vlad Shvydun
Arash Farhoodfar
Jamal Riani
Inphi
Summary of Error Propagation for 100GBASE-KR1/CR1 4-September-2019 Yan Zhuang
Yuchun (Louis) Lu
Huawei
Auto-Negotiation for Dual mode FEC 4-September-2019 Yan Zhuang
Yuchun (Louis) Lu
Huawei
100GBASE-KR1/CR1 FEC Thoughts 11-September-2019 Mark Gustlin Cisco
ERL KR Baseline Proposal 11-September-2019 Rich Mellitz Samtec
Backplane Reference Rx Tap Weight Data 4-September-2019 Howard Heck
Subas Bastola
Femi Akinwale
Cesar Mendez-Ruiz
Jingbo Li
Intel
ERL Investigations for Ethernet 106G Backplane (II) 4-September-2019 Mike Peng Li
Hsinho Wu
Masashi Shimanouchi
Intel

Late Contributions

Module on-die termination model 12-September-2019 Mark Kimber
Ed Frlan
Bill Kirkland
Semtech
Baseline Proposal for “100 Gb/s, 200 Gb/s, and 400 Gb/s Chip-to-Chip Attachment Unit Interface based on floor feedback 11-Sept 257pm
11-September-2019 Mike Peng Li
Ali Ghiasi
Intel
Ghiasi Quantum
3ck Next Steps
12-September-2019 Kent Lusted Intel
CR Baseline Proposal Considerations at Compliance Points
12-September-2019 Chris Diminico MC Communications/PHI-SI LLC/Panduit



Return to 802.3ck Task Force Public Page
Last Update: 24-September-2019


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]