Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802.3_DIALOG] IEEE P802.3bp 1000BASE-T1 PHY 2nd IEEE 802.3 Working Group recirculation ballot results



Dear Colleagues,

The 2nd IEEE 802.3 Working Group recirculation ballot on the amendment IEEE P802.3bp 1000BASE-T1 PHY closed successfully on 1st December 2015. The ballot exceeded the required 75% for consensus to approve the draft. The December 2015 IEEE P802.3bp Task Force interim meeting <http://www.ieee802.org/3/interims/index.html> will consider the 20 comments submitted and determine changes to the draft as appropriate. The availability of the comment database will be announced on the IEEE P802.3bp Task Force reflector.

The ballot statistics are:

 278 Voters
 163 Approve
   0 Disapprove
  20 Abstain
 183 Ballots returned

  65.83% Response Rate (> 50% required)
  10.93% Abstain Rate (< 30% required)
 100.00% Approval Rate (>= 75% required)

Thank you to all that participated in this ballot. 

David Law
Chair, IEEE 802.3 Ethernet Working Group

Steve Carlson
Chair, IEEE P802.3bp 1000BASE-T1 PHY Task Force