The 2nd Sponsor recirculation ballot on the amendment IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) closed successfully on 6th October 2016. The ballot exceeded the required 75% for consensus to approve the draft. The October 2016 IEEE P802.3bu Task Force interim meeting <http://www.ieee802.org/3/interims/index.html> will consider the one comment submitted and determine changes to the draft as appropriate. The availability of the comment database will be announced on the IEEE P802.3bu Task Force reflector.
The ballot statistics are:
104 Voters
83 Approve
2 Disapprove
4 Abstain
89 Ballots returned
85.58% Response Rate (>= 75% required)
4.49% Abstain Rate (< 30% required)
97.65% Approval Rate (>= 75% required)
Thank you to all that participated in this ballot.