Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Online straw poll closed at 2013-06-14 18:00:00 for: Unofficial IEEE P802.3bn Task Force eStraw Poll #rfspectrum_13 High Band Overlay US/DS Question: (formatted for text): "Should the EPoC standard support a high-band overlay (where the EPoC US/DS are both above the HFC spectrum), in a Node 0 manner? (This would allow deploying EPoC above the current HFC cable plant, without changing any of the actives, by adding a separation diplexer at the last active to add/remove EPoC spectrum). (Refer to presentation: powell_01_1012.pdf pages 4, 6, and 8.) (Reference: ad hoc committee minutes: RF Spectrum_Minutes 6/11/13 )" ---------------------------------------------------- Vote type: Single answer selection per voter. Summary of votes per answer (percent of total): 0) Yes = 12 (85.7%) 1) No = 2 (14.3%) 2) Abstain = 0 (0.0%) Total votes = 14 ________________________________________________________________________ To unsubscribe from the STDS-802-3-EPOC list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-EPOC&A=1
"Full Name",Email,"Voting Member","Vote Date / Time",Answer,Comments "Marek Hajduczenia",marek.hajduczenia@xxxxxx,Y,"2013-06-12 00:26:44",single::1::, "Michel Allard",michel.allard@xxxxxxxxxx,Y,"2013-06-12 05:23:09",single::1::, "William Keasler",wkeasler@xxxxxxxxxx,Y,"2013-06-12 05:44:49",single:0:::, "George Hart",george.hart@xxxxxxxxxxxxxx,N,"2013-06-12 07:05:47",single:0:::, "Hesham ElBakoury",hesham.elbakoury@xxxxxxxxxx,Y,"2013-06-12 10:07:27",single:0:::, "Mike Darling",mike.darling@xxxxxxx,Y,"2013-06-12 12:19:15",single:0:::,"TDD only" "Duane Remein",duane.remein@xxxxxxxxxx,Y,"2013-06-12 17:04:32",single:0:::, "Steve Shellhammer",sshellha@xxxxxxxxxxxxxxxx,Y,"2013-06-13 09:56:55",single:0:::, "Joe Solomon",joe_solomon@xxxxxxxxxxxxxxxxx,Y,"2013-06-13 13:59:07",single:0:::, "Bill Powell",bill.powell@xxxxxxxxxxxxxxxxxx,Y,"2013-06-13 14:13:45",single:0:::,"I think this is an important deployment case to be able to deliver high data BW (enterprise, etc) to the last Active, without disrupting the current US/DS HFC plant & Actives" "Jorge Salinger",Jorge_salinger@xxxxxxxxxxxxxxxxx,Y,"2013-06-14 06:24:36",single:0:::, "Saifur Rahman",saifur_rahman@xxxxxxxxxxxxxxxxx,Y,"2013-06-14 06:27:05",single:0:::, "John Ulm",john.ulm@xxxxxxxxxx,Y,"2013-06-14 13:14:30",single:0:::, "Keiji Tanaka",kj-tanaka@xxxxxxxxxxx,N,"2013-06-14 14:09:43",single:0:::, ________________________________________________________________________ To unsubscribe from the STDS-802-3-EPOC list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-EPOC&A=1