Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Jack, The Hilton rate seems to depend on how
long you want to stay. When I did this on Saturday, if I chose
May 11 to 16, I got among the choices: STANDARD RATE (more) 139.00 EUR
TWIN HILTON GUEST ROOM - FLEXIBLE RATE Likewise for May 12 to 16 STANDARD RATE (more) 139.00 EUR
TWIN HILTON GUEST ROOM - FLEXIBLE RATE However, when I chose May 12 to 15, I got STANDARD RATE (more) 179.00 EUR
TWIN HILTON GUEST ROOM - FLEXIBLE RATE As the cheapest option without full
pre-payment (non-refundable) Regards, Pete Anslow Nortel Networks UK Limited, External +44 1279 402540 ESN 742
2540 Fax +44 1279 402543 From: Jack Jewell
[mailto:Jack.Jewell@JDSU.COM] I booked a room just now via the IEEE site
links. The hotel reservation site said the group rate is no longer
available, and listed a variety of options. So I booked a Twin Hilton
Guest Room with "Flexible Rate" (cancellable/refundable) option at
139 euros/night (incl tax + service charges). Go figure. Jack From: Hays,
Robert [mailto:robert.hays@INTEL.COM] FYI. I booked my room last week at www.hilton.com. 169 euros is the
standard rate on-line. Rob From: John
DAmbrosia [mailto:jdambrosia@FORCE10LABS.COM] Jeff, Thank you for pointing this out to me.
I had just checked the top level page, and saw that it had been updated.
I have no updates on when the block codes
will be available. I know some individuals have been concerned with
booking a room in May, and have chosen to book directly with the hotel. John From: John, The hotel information is no more complete
than what was given at the Interim in Meeting hotel Information
The room
rate for our block is €169. Please check back soon for the block code and other
hotel info. Are we able to book without waiting for
the “block code?” Jeff From: John DAmbrosia
[mailto:jdambrosia@FORCE10LABS.COM] Announcement: Hotel information for May Interim Meeting has been
updated (http://grouper.ieee.org/groups/802/3/interims/munich_1_0508.html) Please, also note that electrical supply in Regards, John D’Ambrosia |