Administrative attachments |
|
Attachment A1 |
|
IEEE 802.3 Opening agenda |
|
Attachment A2 |
|
IEEE 802.3 Closing agenda |
|
Attachment A3 |
|
IEEE 802.3 Opening report |
|
Attachment A4 |
|
IEEE 802.3 Closing report |
|
Attachment A5 |
|
IEEE 802.3 Meeting attendance procedures |
|
Attachment A6 |
|
IEEE 802.3 Voters list |
|
Attachment A7 |
|
IEEE 802.3 Membership list |
|
Attachment A8 |
|
IEEE 802.3 Potential voter list |
|
Attachment A9 |
|
IEEE 802.3 Voters in peril |
|
Attachment A10 |
|
IEEE 802.3 Attendance credit summary, March 2017 to June 2018 |
|
Attachment A11 |
|
IEEE 802.3 Attendance list San Diego |
|
Attachment A12 |
|
IEEE 802.3 Treasury Report |
|
Attachment A13 |
|
IEEE 802.3 Future meetings closing report,  
September 2018 update,  
Jan 2019 offer,  
May 2020 offer |
|
Attachment A14 |
|
IEEE 802.3 Rules opening report |
|
Attachment A15 |
|
IEEE 802.3 PARs Ad Hoc report |
|
Task Force and Study Group attachments |
|
Attachment B1 |
|
IEEE 802.3 Maintenance opening report |
|
Attachment B2 |
|
IEEE 802.3 Maintenance closing report |
|
Attachment B3 |
|
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report |
|
Attachment B4 |
|
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report |
|
Attachment B5 |
|
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force opening report |
|
Attachment B6 |
|
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force closing report |
|
Attachment B7 |
|
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force opening report |
|
Attachment B8 |
|
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force closing report |
|
Attachment B9 |
|
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force opening report |
|
Attachment B10 |
|
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force closing report |
|
Attachment B11 |
|
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force opening report |
|
Attachment B12 |
|
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force closing report |
|
Attachment B13 |
|
IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force opening report |
|
Attachment B14 |
|
IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force closing report |
|
Attachment B15 |
|
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force opening report |
|
Attachment B16 |
|
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force closing report |
|
Attachment B17 |
|
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force opening report |
|
Attachment B18 |
|
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force closing report |
|
Attachment B19 |
|
IEEE P802.3cm 400 Gb/s over Multimode Fiber Task Force opening report |
|
Attachment B20 |
|
IEEE P802.3cm 400 Gb/s over Multimode Fiber Task Force closing report |
|
Attachment B21 |
|
IEEE 802.3 Beyond 10 km optical PHYs Study Group opening report |
|
Attachment B22 |
|
IEEE 802.3 Beyond 10 km optical PHYs Study Group closing report |
|
Attachment B23 |
|
IEEE 802.3 Bidirectional 10 Gb/s and 25 Gb/s Optical Access PHYs Study Group opening report |
|
Attachment B24 |
|
IEEE 802.3 Bidirectional 10 Gb/s and 25 Gb/s Optical Access PHYs Study Group closing report |
|
Attachment B25 |
|
Industry Connections New Ethernet Applications opening report |
|
Attachment B26 |
|
Industry Connections New Ethernet Applications closing report |
|
Attachment B27 |
|
IEEE 802.3 SCC18 Ad Hoc closing report |
|
Attachment B28 |
|
IEEE 802.3 Isolation Ad Hoc closing report |
|
Attachment B29 |
|
Call for interest: Ethernet access PMDs for central office consolidation opening report |
|
Attachment B30 |
|
Call for interest: Ethernet access PMDs for central office consolidation closing report |
|
Attachment B31 |
|
Call for interest: Bidirectional 50 Gb/s optical access PHYs opening report |
|
Attachment B32 |
|
Call for interest: Bidirectional 50 Gb/s optical access PHYs closing report |
|
Liaison Attachments (External and Internal) |
|
Attachment C1 |
|
TIA TR-42 Liaison Report to IEEE 802.3 |
|
Attachment C2 |
|
Output of the IEEE 802.11 ECR Ad Hoc group
|
|
Attachment C3 |
|
BBF to IEEE 802.3 on EPON YANG model development
|
|
Attachment C4 |
|
MIPI Alliance to IEEE 802.3 on establishing a liaison
|
|
Attachment C5 |
|
ITU-T SG15 to IEEE 802.3 regarding progress on G.698.2
Attachment (Password protected)
|
|
Attachment C6 |
|
BBF to IEEE 1904 on SIEPON YANG Model
|
|
Attachment C7 |
|
OIF to IEEE 802.3 regarding 400ZR Interop Project
Attachment (Password protected)
|
|
Attachment C8 |
|
OIF to IEEE 802.3 regarding progress on OIF CEI-112G project
Attachment (Password protected)
|
|
Attachment C9 |
|
DRAFT liaison to IBTA on status of the IEEE P802.3cd project
|
|
Attachment C10 |
|
DRAFT liaison to INCITS T11.2 on status of the IEEE P802.3cd project
|
|
Attachment C11 |
|
DRAFT liaison to the Broadband Forum regarding EPON YANG data models
|
|
Attachment C12 |
|
DRAFT liaison response to OIF regarding the 400ZR Interop Project
|
|
Attachment C13 |
|
Liaison to IBTA on status of the IEEE P802.3cd project
|
|
Attachment C14 |
|
Liaison to INCITS T11.2 on status of the IEEE P802.3cd project
|
|
Attachment C15 |
|
Liaison to the Broadband Forum regarding EPON YANG data models
|
|
Attachment C16 |
|
Liaison response to OIF regarding the 400ZR Interop Project
|