IEEE 802.3 March 2025 Plenary Minutes

10 to 14 March, 2025



Minutes

Unconfirmed Minutes, IEEE 802.3 Ethernet Working Group Plenary 10 to 14 March, 2025, Atlanta, GA, USA

Administrative attachments

Attachment A1
IEEE 802.3 Opening agenda

Attachment A2
IEEE 802.3 Closing agenda

Attachment A3
IEEE 802.3 Opening report

Attachment A4
IEEE 802.3 Closing report

Attachment A5
IEEE 802.3 Meeting attendance procedures

Attachment A6
IEEE 802.3 Voters list

Attachment A7
IEEE 802.3 Membership list

Attachment A8
IEEE 802.3 Potential voter list(v3)

Attachment A9
IEEE 802.3 Voters in peril

Attachment A10
IEEE 802.3 Attendance credit summary, November 2023 to January 2025

Attachment A11
IEEE 802.3 Attendance list March 2025 Plenary

Attachment A12
IEEE 802.3 Treasury Report

Attachment A13
IEEE 802.3 Future meetings closing report

Attachment A14
IEEE 802.3 Dell Technologies Offer to Host

Attachment A15
TIA TR-42 Liaison report

Attachment A16
ISO/IEC SC25/WG3 Liaison Report

Task Force and Study Group attachments

Opening plenary meeting reports

Attachment B1
IEEE 802.3 Maintenance opening report

Attachment B2
IEEE P802.3da 10 Mb/s Single Pair Multidrop Segments Enhancement Task Force opening report

Attachment B3
IEEE P802.3dg 100 Mb/s Long-Reach Single Pair Ethernet Task Force opening report

Attachment B4
IEEE P802.3dj 200 Gb/s, 400 Gb/s, 800 Gb/s, and 1.6 Tb/s Ethernet Task Force opening report(rev a)

Attachment B5
IEEE P802.3dk Greater than 50 Gb/s Bidirectional Optical Access PHYs Task Force opening report

Attachment B6
IEEE P802.3dm Asymmetrical Electrical Automotive Ethernet Task Force opening report(rev a)

Attachment B7
IEEE P802.3.2 YANG Data Models Task Force opening report

Attachment B8
IEEE 802.3 New Ethernet Applications Ad Hoc opening report

Attachment B9
IEEE 802.3 Power Delivery Coordinating Committee Ad Hoc opening report

Attachment B10
IEEE 802.3 Single-Pair Ethernet Powering Cabling Restrictions Study Group opening report

Attachment B11
IEEE 802.3 Pin-Optimized PHY Interface Study Group Study Group opening report

Attachment B12
IEEE 802.3 Channel Operating margin (COM) opening report

Closing plenary meeting reports

Attachment C1
IEEE 802.3 Maintenance closing report

Attachment C2
IEEE P802.3da 10 Mb/s Single Pair Multidrop Segments Enhancement Task Force closing report

Attachment C3
IEEE P802.3dg 100 Mb/s Long-Reach Single Pair Ethernet Task Force closing report

Attachment C4
IEEE P802.3dj 200 Gb/s, 400 Gb/s, 800 Gb/s, and 1.6 Tb/s Ethernet Task Force closing report

Attachment C5
IEEE P802.3dk Greater than 50 Gb/s Bidirectional Optical Access PHYs Task Force closing report

Attachment C6
IEEE P802.3dm Asymmetrical Electrical Automotive Ethernet Task Force closing report

Attachment C7
IEEE P802.3.2 YANG Data Models Task Force closing report

Attachment C8
IEEE 802.3 Single-Pair Ethernet Powering Cabling Restrictions Study Group closing report

Attachment C9
IEEE 802.3 New Ethernet Applications Ad Hoc closing report

Liaison Attachments (External and Internal)

Attachment D1
ASA to IEEE 802.3: Liaison of ASA Motion Link specification V2.1
Attachment(Password protected)

Attachment D2
OIF to IEEE 802.3: OIF High Density Connector project

Attachment D3
UEC to IEEE 802.3: Ultra-Ethernet Consortium Ethernet Extensions

Draft Outgoing Liaison Letters and Liaison Contribution

Attachment E1
Draft IEEE 802.3 to ASA: Liaison reply to liaison dated 11 February 2025

Attachment E2
Draft IEEE 802.3 to ITU-T SG15: Liaison to ITU-T SG15 regarding 1.6T OTN mapping reference (reply to SG15-LS6)

Attachment E3
Draft IEEE 802.3 to ITU-T SG15: IEEE 802.3 update on HNT standardization work plan

Attachment E4
Draft IEEE 802.3 to ITU-T SG15: Liaison reply to ITU-T SG15: ANT Standardization Work Plan

Attachment E5
Draft IEEE 802.3 to ITU-T SG15: Liaison reply to ITU-T SG15: OTNT Standardization Work Plan

Attachment E6
Draft IEEE 802.3 to UALink, UEC, OCP, SNIA, EA, OIF: Establishment of liaison relationships and appointment of liaison officers

Final Outgoing Liaison Letters and Liaison Contribution

Attachment F1
IEEE 802.3 to ASA: Liaison reply to liaison dated 11 February 2025

Attachment F2
IEEE 802.3 to ITU-T SG15: Liaison to ITU-T SG15 regarding 1.6T OTN mapping reference (reply to SG15-LS6)

Attachment F3
IEEE 802.3 to ITU-T SG15: IEEE 802.3 update on HNT standardization work plan

Attachment F4
IEEE 802.3 to ITU-T SG15: Liaison reply to ITU-T SG15: ANT Standardization Work Plan

Attachment F5
IEEE 802.3 to ITU-T SG15: Liaison reply to ITU-T SG15: OTNT Standardization Work Plan

Attachment F6
IEEE 802.3 to UALink, UEC, OCP, SNIA, EA, OIF: Establishment of liaison relationships and appointment of liaison officers


Return to IEEE 802.3 Minutes page
Last Update: 18-Mar-25


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]