IEEE 802.3 November 2011 Plenary Minutes

November 7-10, 2011
Atlanta, GA


Minutes

Approved Minutes, IEEE 802.3 Ethernet Working Group PLENARY, Atlanta, GA, November 7-10, 2011


Administrative attachments

Attachment A1
IEEE 802.3 Opening agenda

Attachment A2
IEEE 802.3 Closing agenda

Attachment A3
IEEE 802.3 Opening report

Attachment A4
IEEE 802.3 Closing report

Attachment A5
IEEE 802.3 Meeting attendance procedures

Attachment A6
IEEE 802.3 Voting member list

Attachment A7
IEEE 802.3 Potential voter list

Attachment A8
IEEE 802.3 Voters in peril

Attachment A9
IEEE 802.3 Attendance credit summary, July 2010  to September 2011

Attachment A10
IEEE 802.3 Attendance list

Attachment A11
IEEE 802.3 Treasury Report

Attachment A12
IEEE 802.3 Standards status

Attachment A13
IEEE 802.3 Room assignments

Attachment A14
IEEE 802.3 Future Meetings opening report

Attachment A15
IEEE 802.3 Future Meetings closing report

Attachment A16
IEEE 802.3 January 2012 interim meeting: Newport Beach, CA

Task Force and Study Group attachments

Attachment B1
IEEE 802.3 Maintenance opening report

Attachment B2
IEEE 802.3 Maintenance closing report (Attachment)

Attachment B3
IEEE 802.3 Interpretations opening report

Attachment B4
IEEE 802.3 Interpretations closing report

Attachment B5
IEEE P802.3.1 (IEEE 802.3.1a) Ethernet MIBs (revision) Task Force opening report

Attachment B6
IEEE P802.3.1 (IEEE 802.3.1a) Ethernet MIBs (revision) Task Force closing report

Attachment B7
IEEE P802.3bj 100 Gb/s Backplane and Copper Task Force opening report

Attachment B8
IEEE P802.3bj 100 Gb/s Backplane and Copper Task Force closing report

Attachment B9
IEEE 802.3 Ethernet Bandwidth Assessment Ad Hoc opening report

Attachment B10
IEEE 802.3 Ethernet Bandwidth Assessment Ad Hoc closing report

Attachment B11
IEEE 802.3 Next Generation 100 Gb/s Optical Ethernet Study Group opening report

Attachment B12
IEEE 802.3 Next Generation 100 Gb/s Optical Ethernet Study Group closing report

Attachment B13
IEEE 802.3 Extended EPON Study Group opening report

Attachment B14
IEEE 802.3 Extended EPON Study Group closing report

Attachment B15
Call for Interest: EPON PHY for Coax call for interest opening report

Attachment B16
Call for Interest: EPON PHY for Coax call for interest closing report

Liaison Attachments (External and Internal)

Attachment C1
ISO/IEC SC25/WG3 report to 802.3

Attachment C2
TIA TR-42 Liaison Report to 802.3

Attachment C3
Liaison letter from ITU-T SG5 to IEEE-SA regarding a request for a liaison on Ethernet port isolation

Attachment C4
Liaison letter from the OIF to IEEE 802.3 regarding the Multi-Link Gearbox (MLG) project
Attachment (Password protected)

Attachment C5
Liaison letter from the ITU-T SG15 to IEEE 802.3 regarding new recommendation ITU-T G.9973
Attachment (Password protected)

Attachment C6
Liaison letter from the OIF to IEEE 802.3 regarding the OIF CEI-28G-VSR project

Attachment C7
DRAFT liaison reply from IEEE 802.3 to ITU-T SG15 regarding OTNT Standardization Work Plan

Attachment C7
Liaison reply from IEEE 802.3 to ITU-T SG15 regarding OTNT Standardization Work Plan


Return to IEEE 802.3 Minutes page
Last Update: 04 Apr 12


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]