Meeting Materials
all_files.zip 15-Mar-07 11.8M |
|||||
Approved Meeting Minutes New! 21-Mar-07 61K |
|
|
|||
Chair's Agenda and General Information 12-Mar-07 143K |
John D'Ambrosia | Force10 Networks | |||
IEEE 802.3 HSSG Opening Plenary Report 15-Mar-07 107K |
John D'Ambrosia | Force10 Networks | |||
HSSG Tuesday Discussions 14-Mar-07 51K |
John D'Ambrosia | Force10 Networks | |||
HSSG Wednesday Discussions 15-Mar-07 56K |
John D'Ambrosia | Force10 Networks | |||
HSSG Thursday Discussions New! 19-Mar-07 70K |
John D'Ambrosia | Force10 Networks | |||
IEEE 802.3 HSSG Closing Plenary Report 15-Mar-07 85K |
John D'Ambrosia | Force10 Networks | |||
Fiber Optic Ad Hoc 12-Mar-07 149K |
Dan Dove | HP | |||
Technical & Economic Feasibility of 10km SMF 100GE Transceivers
9-Mar-07 372K |
Chris Cole | Finisar | |||
Broad Market Potential of 100GE Transceivers 9-Mar-07 122K |
Chris Cole | Finisar | |||
Mapping of 100 Gbit/s Ethernet into OTN and the need for a Lane Independent PCS
11-Jan-07 139K |
Steve Trowbridge | Alcatel-Lucent | |||
Single Mode Fibre Loss 9-Mar-07 103K |
Pete Anslow
|
Nortel
|
|||
Loss Information Spreadsheet 9-Mar-07 89K |
Pete Anslow | Nortel | |||
The need for a low-cost 100GbE inter-rack copper interconnect 9-Mar-07 112K |
Mike Bennett | LBNL | |||
The Ethernet EcoSystem - Broad Market Potential for 100 Gb Ethernet
9-Mar-07 1267K |
Joel Goergen Mark Nowell |
Force10 Networks Cisco |
|||
HSSG Presentation Mapping to 5 Criteria Responses 9-Mar-07 28K |
John Jaeger | Infinera | |||
HSSG Presentation Mapping to 5 Criteria Responses - Spreadsheet 9-Mar-07 42K |
John Jaeger | Infinera | |||
24 AWG twinaxial cable structure for 25Gb applications 9-Mar-07 85K |
Carl Booth | Amphenol | |||
Relative cost of 100GbE point-to-point links 9-Mar-07 874K |
John Abbott Doug Coleman Jabulani Dhliwayo Peter Ronco Steve Swanson |
Corning
| |||
Financial Industry Projected Bandwidth Growth 14-Mar-07 102K |
Andy Bach | New York Stock Exchange | |||
100GbE, 10x10 Alternative 9-Mar-07 336K |
Arlon Martin | Kotura | |||
100G Copper Proposal: Technical Feasibility From Connector
Technology Standpoint 9-Mar-07 1218K |
Gourgen Oganessyan Jim McGrath |
Molex
|
|||
Higher Speed Ethernet and Server Requirements 9-Mar-07 321K |
Schelto Vandoorn | Intel | |||
"To Infinity and Beyond!": Why 40km+ Links Matter and What HSSG Might Do About It 9-Mar-07 1371K |
Ted Woodward | Telcordia Technologies | |||
Future Market Potential for 100G Ethernet, An MSO Perspective by Time Warner Cable
9-Mar-07 1365K |
Bill Trubey Bob Harris |
Time Warner Cable
|
|||
Updated cost analysis of MMF variants 9-Mar-07 198K |
Paul Kolesar | Systimax | |||
25 Gbps SerDes 9-Mar-07 388K |
Charlie Zhong Cathy Liu Freeman Zhong |
LSI
| |||
Saturating 100G and 1T Pipes 9-Mar-07 42K |
Donn Lee | ||||
High Speed Copper Cabling for HSSG 9-Mar-07 229K |
Herb Van Deusen | Gore Associates | |||
High Speed Study Group objectives and five criteria 9-Mar-07 832K |
Chris Diminco Michael Bennett Yakov Belopolsky Ed Cady Larry Cohen Suveer Dhamejani Alan Flatman Henning Hansent Sanjay Kasturia Greg McSorley Ron Nordin Joe O'brien Gourgen Oganessyan Joe Pein Petre Popescu Bob Thornton Herb Van Deusen George Zimmerman |
MC Communications LBLnet Services Group Bel Stewart Connector Meritec Independent Tyco Electronics Independent Leoni High Speed Cables Teranetics Amphenol Interconnect Products Panduit Corporation Efficere Technologies Molex Incorporated Honda Connector Astar Fujitsu Components America W.L. Gore SolarFlare Communications | |||
Carrier Hurdles To Meeting 10GE Demand 9-Mar-07 159K |
Ted Seely | Sprint Nextel | |||
Twinaxial cable assembly transmission characteristics
9-Mar-07 105K |
Chris DiMinico George Zimmerman |
MC Communications SolarFlare Communications |
|||
Approach for 40km PMD 9-Mar-07 259K |
Matt Traverso | OpNext | |||
Optical Specifications for 10km Link 9-Mar-07 237K |
Matt Traverso | OpNext | |||
40 Gb/s Ethernet 5 Criteria Responses 9-Mar-07 66K |
Howard Frazier | Broadcom | |||
A Web Company’s View on Ethernet 9-Mar-07 327K |
Adam Bechtel | Yahoo! | |||
Understanding a 40km Reach Objective 9-Mar-07 857K |
Joel Goergen | Force10 Networks | |||
100G Ethernet Test Adapter
9-Mar-07 807K |
Will Miller | Efficere Technologies | |||
Bandwidth Drivers in Broadband Access - A BMP case study from EPON perspective
9-Mar-07 937K |
Frank Chang Badri Gomatam KeijiTanaka |
Vitesse Vitesse KDDI | |||
10x10G VCSEL Array Feasibility Issues
9-Mar-07 429K |
Jack Jewell Mike Dudek |
Picolight
|
|||
100G Ethernet - Tomorrow Is Too Late
9-Mar-07 89K |
Troy Sprenger Ed Reynolds |
EDS
|
|||
100GE - 10/40km economic feasibility New! 14-Mar-07 291K |
Ralf-Peter Braun | Deutsche Telekom AG |
Return to IEEE 802.3 Higher Speed Study Group Home Page
Last Update: 21 March 2007
Questions or comments: send e-mail to Webmaster