Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Jerry and all,
Sorry for the late response.
Here are my comments for the next conf.
call.
1. Reorganization of section 6
I would like to remove RS
characteristics.
Instead, my proposal is
6. RS mobility
7. RS Ownership
8. Antenna usage
Main reason of this change is antenna usage includes
BS characteristics as well as RS
characteristics.
So I would like to make antenna usage the
independent section 8
Lastly I do not want include availability in this
document.
It seems more like solution including preferences of
service provider.
2. RS Ownership
I would like to make it clear what is ownership
is.
I think
- who controls RS
- who installs RS
- who decides place of RS
antenna
- who pays for RS equipment
may be considered for infrastructure(provider) or
client ownership
My understanding is
- infrastructure (or provider)
ownership
*provider controls/installs/decides place
of RS
- client ownership
*provider controls RS, user
installs/decides place of RS
Best Regards,
Asa From: Sydir, Jerry [mailto:jerry.sydir@INTEL.COM] Sent: Thursday, June 15, 2006 5:33 AM To: STDS-802-16@listserv.ieee.org Subject: [STDS-802-16] [MMR-AH-UM] Agenda for 6/15/06 Meeting of Multihop Relay Usage Model Ad Hoc Group Agenda: -
Roll
call -
Discuss points raised
in email discussion: -
Section 6.4 – need to
discuss again the level of detail that should be captured in this
section -
Section 6 in general –
is there any missing content? -
Section 5.3 – proposal
to specify that route selection is centralized (from Jen-Shun
Yang) -
Discuss any other
technical comments on the current draft -
Access the status of
the draft – do we have consensus? -
Discuss next
steps o
Proposals for
additional usage models? o
Wrapping up the editing
of the contribution From:
Dear Ad Hoc
participants, The next meeting of the Multihop
Relay Usage Model Ad Hoc Group will occur on Thursday June 15, 06:00 –
08:00 PDT (13:00 – 15:00 UTC). The bridge for the meeting is
916-356-2663, Bridge: 1, Passcode: 4686427 I have updated the draft to include
modifications to the outline that we agreed to in the June 8 meeting. It can be
found in the following location: http://dot16.org/CSUpload//upload/temp_db/C80216j%2d06_UMAHtemp_r3a.doc
. Please take care to look at the r3a
version of the document. There is an r3 version that I had uploaded to the
server, but I discovered that I had not made all of the agreed upon
modifications, so I created the r3a version. My plan is to assemble a list of
issues that we need to resolve in the next meeting via email discussion before
the meeting. Please review the document and bring up issues that you have with
the technical content (or missing content) of the document. (Editorial comments
are welcome, but we may want to hold off on making editorial changes until we
are sure that we are not changing the technical content).
Please send your comments to the
list before Wednesday 08:00 PDT. I will assemble a list of issues for us to
resolve based on the comments received up to that point. Below is the tentative
agenda for the meeting. I will send out an updated agenda on
Wednesday. -
Roll
call -
Discuss points raised
in email discussion: -
Section 6.4 – need to
discuss again the level of detail that should be captured in this
section -
Section 6 in general –
is there any missing content? -
Discuss any other
technical comments on the current draft -
Access the status of
the draft – do we have consensus? -
Discuss proposals for
additional usage models -
Discuss next
steps o
Proposals for
additional usage models? o
Wrapping up the editing
of the contribution |