Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear All, Attached is a new version of the optical power budget
presentation. Change notes: 1. The technical values have not changed since the last
version. 2. Added a page to hold supporter¡¯s names. 3. Added a page of ¡®conditions¡¯ which gives the key
definition elements of the budget numbers, and requirements on the FEC
algorithm. 4. Added a page that refers to the optical budget
spreadsheet that holds the exact calculation of the budget. (Note: this document will be coming soon.) If you would like to sign on as a supporter of this
position, please let me know. Sincerely, Dr. Frank J. Effenberger ¸¥À¼¿Ë °£·Ò²©¸ñ Huawei Technologies Office (732) 625 3002 Cell (908) 670 3889 |