I was completely frustrated by the 802.3 Working Group’s lack of
constructive
response to Walter Thirion’s plea for their help in clarifying the PMD
objectives
at the thursday meeting. I believe that Walter was trying to re-center the
debate on
the PMD objectives in order to break the impasse on their implementations.
I believe Walter was on the right track. I propose that the committee
should debate
the objectives of the PMD’s to clearly identify the application space and
cost considerations.
I offer the following as a point of departure.
Objectives for debate:
- support of installed (legacy) 62.5 and 50 micron multimode fiber to 300
meters.
- support of a low-cost short-reach fiber solution for the Internet Data
Center, Central Office,
equipment room, and premise application to 300 meters (new
installations).
Potential 10 Gb/s Ethernet customers addressing the committee have voiced
strong
support for inclusion of a low-cost short-reach fiber objective to address
the application space
of the Internet Data Center, the Equipment Room and the Central
Office.
Chris Di Minico
Cable Design Technologies (CDT) Corporation
Director of Network Systems Technology
Phone: 800-422-9961 ext:333
e-mail: cd@xxxxxxxxxxxxxx
|