[10GBASE-CX4] Is our PAR document now perfect?
Hello All;
I just want to confirm that you have been over to the CX4 website,
downloaded the PAR document, downloaded the objectives and
5 criteria, and have reviewed them and found them to be exactly what
we want to present to 802.3 and the 802 executive committee. We
are very close to the deadline so anything that should have been on
that document should be in it by next Monday.
The PAR is located at
http://www.ieee802.org/3/10GBCX4/802-3akpar.pdf
The 5 Criteria are located at
http://www.ieee802.org/3/10GBCX4/public/dec02/5critters.pdf
The stated objectives of the SG is located at
http://www.ieee802.org/3/10GBCX4/public/dec02/CX4Objectives.pdf
Please jump on over, review and let me know if you see anything that
is either missing or incorrect.
Oh yeah, by the way; If you are planning to attend the February
interim, PLEASE SIGN UP with the hotel ASAP! :-)
Thanks,
Dan
======================================
Principal Engineer, LAN PHY Technology
System Architect, Workgroup Switching
dan.dove@hp.com
hp ProCurve Networking Business
8000 Foothills Blvd. MS 5555
Roseville, CA 95747-5555
Phone: 916 785 4187
Fax : 916 785 1815
======================================