IEEE P802.3ck Task Force Meeting Page


Meeting Materials for:
Interim Meeting
Week of January 20, 2020
Geneva, Switzerland

Download all initial meeting materials here: Loaded 14 January 2020, 150pm Pacific

General Information

Agenda Updated 01a 21-January-2020 Kent Lusted Intel
Chief Editor's Report 21-January-2020 Matt Brown Huawei
Comment Agenda 21 January 2020 Matt Brown Huawei
Minutes
18 March 2020 Beth Kochuparambil
Kent Lusted
Cisco
Intel

Liaison Letters

OIF to IEEE 802.3 regarding progress on OIF CEI-112G-VSR & CEI-112G-LR project and the attachment 2 January 2020
Proposed Response
Then after group edits
21 January 2020
23 January 2020
Proposed liaison to Fibre Channel T11.2
Then after group edits
22 January 2020
23 January 2020
<-- -- <-- -- --> <-- -- -->

Contributed Presentations - Grouped by Topic (Not presentation Order)

100G FEC

Sublayer Delay for Interleaved 100G FEC 21-January-2020 Shawn Nicholl
Ben Jones
Xilinx
Xilinx
100GBASE-KR1/CR1 AN Direction 10-January-2020 Mark Gustlin
Jeff Slavick
Cisco
Broadcom
Supporting Material for Comment 103 12-January-2020 Jeff Slavick Broadcom

Chip-to-Module

C2M TP1a spec proposal 21-January-2020 Mau-Lin Wu
Yu-Yun Chang
Chung-Hsien Tsai
MediaTek
MediaTek
MediaTek
C2M Methodology, CTLE gain, and DFE taps 21-Janaury-2020 Ali Ghiasi Ghiasi Quantum/Inphi
Effect of improved connector and additional module IC noise on whole channel performance and the comparison with TP1a performance 12-January-2020 Mike Dudek
Tao Hu
Marvell
Marvell
C2M VEC thresholds 12-January-2020 Junqing (Phil) Sun
Yasuo Hidaka
Credo
Credo

Copper Cables

In support of test fixtures comments 10-January-2020 Ali Ghiasi Ghiasi Quantum/Inphi
162B.1 Mated Test Fixtures 13-January-2020 Chris Diminico MC Communications/PHY-SI LLC/Panduit
CR Minimum Cable Assembly and Channel Insertion Loss 13-January-2020 Chris Diminico MC Communications/PHY-SI LLC/Panduit

Backplane

Practical Device Test Fixtures for 100G KR ... or Not and the Impact on ERL and P max /V f (ref: comment 19, 20, 21, 25) 21-January-2020 Rich Mellitz
Mike Li
Masashi Shimanouchi
Hsinho Wu
Samtec
Intel
Intel
Intel
BP OD Channel Analysis
Channel contribution posted here on tools and channels page
21-January-2020 Tom Palkert Molex

Chip-to-Chip, ERL, Other

ERL Capable of DFE Floating-Tap (Update) 10-January-2020 Mau-Lin Wu
Yu-Yun Chang
MediaTek
MediaTek
C2C Channel Equalization 23-January-2020 Ali Ghiasi Ghiasi Quantum/Inphi
Evaluation of 53 GBd PAM4 ("112G") signal through Wilder OSFP Fixture 21-January-2020 John Calvin
Rob Sleigh
Greg D Le Cheminant
Steve Sekel
Ryan Chodora
Marlin Viss
Ray Schmelzer
Keysight Technologies
Keysight Technologies
Keysight Technologies
Keysight Technologies
Keysight Technologies
Keysight Technologies
Wilder Technologies

Late Contributions

A closer look at effective return loss 21-January-2020 Adam Healey Broadcom
Comment #207 Proposed Resolution 22-January-2020 Sam Kocsis Amphenol



Return to 802.3ck Task Force Public Page
Last Update: 23 January 2020


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]