IEEE 802.3 November 2009 Plenary Minutes
November 16-19, 2009
Atlanta, GA USA
Minutes
Approved Minutes, IEEE 802.3 CSMA/CD PLENARY, Atlanta, GA, November 16-19, 2009
Administrative attachments
Attachment A1
IEEE 802.3 Opening report
Attachment A2
IEEE 802.3 Closing report
Attachment A3
IEEE 802.3 Opening agenda
Attachment A4
IEEE 802.3 Closing agenda
Attachment A5
IEEE 802.3 Voting member list
Attachment A6
IEEE 802.3 Potential voter list
Attachment A7
IEEE 802.3 Voters in peril
Attachment A8
IEEE 802.3 Attendance credit summary, July 2008 to September 2009
Attachment A9
IEEE 802.3 Attendance list
Attachment A10
IEEE 802.3 Treasurer's Report
Attachment A11
Proposed Project P1904.1: Service Interoperability in Ethernet Passive Optical Networks (SIEPON)
Attachment A12
IEEE-SA International Standards Program - MOU Program
Attachment A13
IEEE 802.3 Standards status
Attachment A14
IEEE 802.3 Room assignments
Attachment A15
IEEE 802.3 Future Meetings: Opening report
Attachment A16
IEEE 802.3 Future Meetings: Closing report
Attachment A17
ITU-T / IEEE collaboration
Task Force and Study Group attachments
Attachment B1
IEEE 802.3 IEEE 802.3 DTE Power Enhancements Task Force final report
Attachment B2
IEEE 802.3 10 Gb/s EPON Task Force final report
Attachment B3
IEEE 802.3 Energy Efficient Ethernet Task Force opening report
Attachment B4
IEEE 802.3 Energy Efficient Ethernet Task Force closing report
Attachment B5
IEEE 802.3 40 Gb/s and 100 Gb/s Ethernet Task Force opening report
Attachment B6
IEEE 802.3 40 Gb/s and 100 Gb/s Ethernet Task Force closing report
Attachment B7
IEEE 802.3 Maintenance opening report
Attachment B8
IEEE 802.3 Maintenance closing report
Attachment B9
IEEE 802.3 Interpretations opening report
Attachment B10
IEEE 802.3 Interpretations closing report
Attachment B11
IEEE 802.3.1 (P802.3be) Ethernet Management Information Base Task Force opening report
Attachment B12
IEEE 802.3.1 (P802.3be) Ethernet Management Information Base Task Force closing report
Attachment B13
Support for IEEE P802.1AS Time and Synchronization Study Group opening report
Attachment B14
Support for IEEE P802.1AS Time and Synchronization Study Group closing report
Attachment B15
Call for interest: 40Gb/s Ethernet Single-mode Fibre PMD opening report
Attachment B16
Call for interest: 40Gb/s Ethernet Single-mode Fibre PMD closing report
Liaison Attachments (External and Internal)
Attachment C1
ISO/IEC SC25/WG3 Liaison Report to 802.3
Attachment C2
TIA TR-42 Liaison Report to 802.3
Attachment C3
INCITS T11.2 Liaison Report to 802.3
Attachment C4
Smart Grid / P2030 Status Report to 802.3
Attachment C5
IEEE 802 Emergency Services Study Group Report to 802.3
Attachment C6
Liaison letter from TIA TR-42 to IEEE 802.3 regarding TSB-184 (PN-3-0324-B-1) default ballot comment resolution
Attachment C7
Liaison letter from the OIF to IEEE 802.3 regarding the CEI-25 project
Attachment 1: CEI-28G-SR
(Password protected)
Attachment 2: CEI-25G-LR
(Password protected)
Attachment C8
Liaison response from ITU-T SG15 to IEEE 802.3 COM15-LS65-E regarding 1-Gbit/s point-to-point Ethernet-based optical access system
Attachment
(Password protected)
Attachment C9
Liaison response from ITU-T SG15 to IEEE 802.3 COM15-LS66-E regarding the provision of precise timing over PON technologies
Attachment
(Password protected)
Attachment C10
Liaison letter from ITU-T SG15 to IEEE 802.3 COM15-LS97-E regarding regarding the OTNT Standardization Work Plan
Attachment
(Password protected)
Attachment C11
Letter from the US EPA to IEEE 802.3 regarding the development of an ENERGY STAR specification for Small Network Equipment (SNE)
Attachment C12
Letter from the ITU Telecommunication Standardization Bureau to IEEE 802.3 regarding IEEE 802 interim sessions, May 2010
Attachment C13
Liaison letter from ITU-T Study Group 15 to the IEEE P802.3ba Task Force COM15-LS85-E regarding ITU-T G.709 approval
Attachment 1: Draft revised G.709 for consent
(Password protected)
Attachment 2: Draft Revised Recommendation G.959.1 for consent
(Password protected)
Attachment 3: Draft Revised Recommendation ITU-T G.695 for consent
(Password protected)
Attachment C14
IEEE-SA MOU ANNEX B - Technical Cooperation Agreement
(Password protected)
Attachment C15
Liaison response from IEEE 802.3 to the OIF regarding the CEI-25 project
Attachment C16
Liaison response from IEEE 802.1 and IEEE 802.3 to ITU-T SG15 regarding the provision of precise timing over PON technologies
Return to IEEE 802.3 Minutes page
Last Update: 19-Nov 13