Voter lists and any incoming liaisons
Minutes |
Unconfirmed Minutes, IEEE 802.3 Ethernet Working Group Plenary 11 to 15 November, 2024, Vancouver, BC, Canada |
Administrative attachments | |||
Attachment A1 | IEEE 802.3 Opening agenda | ||
Attachment A2 | IEEE 802.3 Closing agenda | ||
Attachment A3 | IEEE 802.3 Opening report | ||
Attachment A4 | IEEE 802.3 Closing report | ||
Attachment A5 | IEEE 802.3 Meeting attendance procedures | ||
Attachment A6 | IEEE 802.3 Voters list | ||
Attachment A7 | IEEE 802.3 Membership list | ||
Attachment A8 | IEEE 802.3 Potential voter list | ||
Attachment A9 | IEEE 802.3 Voters in peril | ||
Attachment A10 | IEEE 802.3 Attendance credit summary, July 2023 to Sept 2024 (v2) | ||
Attachment A11 | IEEE 802.3 Attendance list November 2024 Plenary | ||
Attachment A12 | IEEE 802.3 Treasury Report | ||
Attachment A13 | IEEE 802.3 Future meetings closing report | ||
Attachment A14 | ITU-T SG15 report | ||
Attachment A15 | ITU-T SG15 report | ||
Task Force and Study Group attachments | |||
Opening plenary meeting reports | Attachment B1 | IEEE 802.3 Maintenance opening report | Attachment B2 | IEEE P802.3da 10 Mb/s Single Pair Multidrop Segments Enhancement Task Force opening report | Attachment B3 | IEEE P802.3dg 100 Mb/s Long-Reach Single Pair Ethernet Task Force opening report | Attachment B4 | IEEE P802.3dj 200 Gb/s, 400 Gb/s, 800 Gb/s, and 1.6 Tb/s Ethernet Task Force opening report | Attachment B5 | IEEE P802.3dk Greater than 50 Gb/s Bidirectional Optical Access PHYs Task Force opening report | Attachment B6 | IEEE P802.3dm Asymmetrical Electrical Automotive Ethernet Task Force opening report | Attachment B7 | IEEE Std 802.3-2022/Cor 1 (IEEE 802.3dn) Multi-Gigabit Automotive MDI Return Loss Task Force opening report | Attachment B8 | IEEE P802.3.1 SMIv2 / P802.3.2 YANG Data Models Task Forces opening report | Attachment B9 | IEEE 802.3 New Ethernet Applications Ad Hoc opening report | Attachment B10 | IEEE 802.3 Power Delivery Coordinating Committee Ad Hoc opening report | Attachment B11 | IEEE 802.3 Single-Pair Ethernet Powering Cabling Restrictions Study Group opening report |
Closing plenary meeting reports | Attachment C1 | IEEE 802.3 Maintenance closing report | Attachment C2 | IEEE P802.3da 10 Mb/s Single Pair Multidrop Segments Enhancement Task Force closing report | Attachment C3 | IEEE P802.3dg 100 Mb/s Long-Reach Single Pair Ethernet Task Force closing report | Attachment C4 | IEEE P802.3dj 200 Gb/s, 400 Gb/s, 800 Gb/s, and 1.6 Tb/s Ethernet Task Force closing report | Attachment C5 | IEEE P802.3dk Greater than 50 Gb/s Bidirectional Optical Access PHYs Task Force closing report | Attachment C6 | IEEE P802.3dm Asymmetrical Electrical Automotive Ethernet Task Force closing report | Attachment C7 | IEEE Std 802.3-2022/Cor 1 (IEEE 802.3dn) Multi-Gigabit Automotive MDI Return Loss Task Force closing report | Attachment C8 | IEEE P802.3.1 SMIv2 / P802.3.2 YANG Data Models Task Forces closing report | Attachment C9 | IEEE 802.3 Power Delivery Coordinating Committee Ad Hoc closing report | Attachment C10 | IEEE 802.3 Single-Pair Ethernet Powering Cabling Restrictions Study Group closing report |
Liaison Attachments (External and Internal) | |||
Attachment D1 | ITU-T SG 9 to IEEE 802.3: LS on DOCSIS-related work items in ITU-T SG9
Attachment1 (Password protected) Attachment2 (Password protected) Attachment3 (Password protected) |
||
Attachment D2 | ASA to IEEE 802.3: Liaison of ASA Motion Link specification 2.0 to IEEE P802.3dm
Attachment (Password protected) |
||
Draft Outgoing Liaison Letters and Liaison Contribution | |||
Attachment E1 | As needed | ||
Final Outgoing Liaison Letters and Liaison Contribution | |||
Attachment F1 | As needed |
Return to IEEE 802.3 Minutes page
Last Update: 25-Oct-24