Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [RE] Results of today's discussion



At 15:57 30/10/2004 -0700, David V James wrote:
>Bill,
>
>>> 1) How would a PAR for this study group differ from 802.3ar?
>>>    Would the 2 TGs be coordinated somehow?
>I gather you are referring to "Frame Extensions".
>I think RE is dealing mostly with the timely delivery of frames,
>while 802.3ar Frame Extensions is dealing more with increases
>in frame lengths.

Looking at http://www.ieee802.org/3/cm_study/public/september04/agenda_2_0904.pdf (slides 24 onwards), there seems to be more overlap with the Congestion Management SG. There doesn't seem to be a P802.3ar yet, though Frame Extensions SG used that designator in some of their July material.

However, given that FE is considering adding about 500 extra bytes of overhead (!), increasing total frame size by 30% (and potentially including some fields that could be of use to RE), there ought to be some kind of liaison process at the next stage.


John Grant
   ___  ___  ___  ___    ___  ___  ___  ___  ___
  |   ||   ||   ||   |  |   ||   ||   ||   ||   |
  | N || i || n || e |  | T || i || l || e || s |
  |___||___||___||___|  |___||___||___||___||___|

Nine Tiles Networks Ltd, Cambridge, England
+44 1223 862599 and +44 1223 511455
http://www.ninetiles.com