|
WG Chair:
Mark Klerer
Procedural Vice-Chair:
Radhakrishna Canchi
Recording Secretay :
Chirag Patel
|
802.20 Working Group Permanent Documents |
802.20 - PD-15 |
IEEE
802.20b Approved PAR: IEEE Standard for Local and Metropolitan Area Networks - Virtual Bridged Local Area Networks - Amendment: Bridging of 802.20. Contact:Mark Klerer |
802.20 - PD-14 |
IEEE
802.20a Approved PAR: IEEE Standard for Local and Metropolitan Area Networks Part 20: Air Interface for Mobile Broadband Wireless Access Systems Supporting Vehicular Mobility - Physical and Media Access Control Layer Specification - Amendment: Management Information Base Enhancements and Corrigenda Items. Contact:Mark Klerer |
802.20 - PD-13 |
IEEE
802.20.3 Approved PAR: Standard for Minimum Performance Characteristics of IEEE P802.20 Terminals and Base Stations/Access Nodes. Contact:Mark Klerer, (11/2006) |
802.20 - PD-12 |
IEEE
802.20.2 Approved PAR: Standard for Conformance to IEEE P802.20 Systems Protocol Implementation Conformance Statement(PICS)Proforma. Contact: Mark Klerer, (09/2005) |
802.20 - PD-11 |
IEEE 802.20 Declaration of Affiliation (V 1.0) Contact:Mark Klerer, (11/2006) |
802.20 - PD-10 |
IEEE
802.20 Techology Selection Process (V 1.0) Contact: Mark Klerer, (09/2005) |
802.20 - PD-09 |
IEEE
802.20 Evaluation Criteria (V 1.0) Contact: Mark Klerer, (09/2005) |
802.20
- PD-08r1 |
IEEE
802.20 Channel Models (V 2.0) Contact:Mark Klerer, (03/2007) |
802.20
- PD-07r8 |
Revision IEEE
802.20 WG Project Development Plan - Contact: Mark Klerer, (1/2010) |
802.20
- PD-06r1 |
IEEE
802.20 System Requirement Document (V 1.0) Contact: Mark Klerer, (08/2004) |
802.20
- PD-05r1 |
Revised IEEE 802.20 Policies
and Procedures (3/2008) |
802.20
- PD-05 |
IEEE 802.20 Policies
and Procedures (V 1.0)(Contact:Mark Klerer, (01/2004)(Obsolete) |
802.20 - PD-04 |
Introduction to
IEEE 802.20: Technical and Procedural Orientation (Contact: Mark Klerer , (03/2003)) |
802.20 - PD-03 |
Mobile Broadband Wireless Access Systems: Five Criteria (FINAL)
(02/11/13) |
802.20 - PD-02 |
Mobile Broadband Wireless Access Systems: Approved PAR (02/12/11) |
802.20
- PD-01 v0.1 |
Draft 802.20 Operating
Rules (V 0.1) (Contact:Mark Klerer, (02/2003)) |
802.20 Working Group Documents - 2010 |
802.20
- 10/03 |
Draft Minutes for Session #41, March, 2010; Orlando, FL. Contact:: Mark Klerer |
802.20
- 10/02 |
Opening Slide Set for Session #41, March, 2010; Orlando, FL. Contact:: Mark Klerer |
802.20
- 10/01r1 |
Minutes for Session #40, 18 January, 2010; Los Angeles, GA. Contact:: Mark Klerer |
802.20 Working Group Documents - 2009 |
802.20
- 09/16 |
Minuts for Session #39, 16 -20 November, 2009; Atlanta, GA, USA. Contact:: Mark Klerer |
802.20
- 09/15 |
Opening Slide Set for Session #39, 16 -20 November, 2009; Atlanta, GA. Contact:: Mark Klerer |
802.20
- 09/14 |
Draft of 802.20b Editor: Mark Klerer |
802.20
- 09/13 |
Draft Agenda for Session #39, 16 -20 November, 2009; Atlanta, GA, USA. Contact:: Mark Klerer |
802.20
- 09/12 |
Minutes, 802.20 Session #38, 22 -24 September, 2009; Waikoloa Village, Hawaii. Contact: Mark Klerer |
802.20
- 09/11 |
Opening Slide Set for Session #38, 22 -24 September, 2009; Waikoloa Village, Hawaii. Contact:: Mark Klerer |
802.20
- 09/10 |
Draft Agenda for Session #38, 22 -24 September, 2009; Waikoloa Village, Hawaii. Contact:: Mark Klerer |
802.20
- 09/09 |
Minutes, 802.20 Session #37, 13-14 July 2009; San Francisco, CA. Contact: Mark Klerer |
802.20
- 09/08 |
802.20a Draft 1.0 Meeting Review Copy. Contact: Mark Klerer |
802.20
- 09/07 |
Minutes, 802.20 Session #36, 11 May, 2009; Montreal, Quebec, Canada. Contact: Mark Klerer |
802.20
- 09/06 |
Agenda for Session #37, 13 -14 July, 2009; San Francisco, California Contact:: Mark Klerer |
802.20
- 09/05 |
Agenda for Session #36, 11-12 March, 2009;Montreal, Quebec, Canada Contact:: Mark Klerer |
802.20
- 09/04R1 |
Minutes, 802.20 Session #35, 9-12 March, 2009; Vancouver, BC, Canada. Contact: Mark Klerer |
802.20
- 09/03r1 |
Agenda for Session #35, 9-12 March, 2009;Vancouver, BC, Canada Contact:: Mark Klerer |
802.20
- 09/02 |
Draft Minutes, 802.20 Session #34, 19-20 january, 2009; Los Angeles, CA, USA. Contact: Mark Klerer |
802.20
- 09/01 |
Preliminary Agenda for Session #34, 19-20 January, 2009; Los Angeles, CA, USA Contact:: Mark Klerer |
802.20 Working Group Documents - 2008 |
802.20
- 08/20r1 |
Minutes, 802.20 Session #33, 9-13 November, 2008; Dallas, TX, USA. Contact: Mark Klerer |
802.20
- 08/19r1 |
Draft Standard IEEE802.20.3 Minimum Performance Specification for 802.20 Implementations Contact:: Mark Klerer |
802.20
- 08/18 |
Draft Standard IEEE802.20.2 Protocol Implementation Conformance Statement (PICS) Proforma Contact:: Mark Klerer |
802.20
- 08/16r1 |
Minutes, 802.20 Session #32 8-12 September, 2008; Waikoloa, HI, USA. Contact: Mark Klerer |
802.20
- 08/15r1 |
Revised Working Group approved PAR for 802.20 Bridging Amendment. Contact: Mark Klerer |
802.20
- 08/14 |
Agenda for Session #32, 7-12 September, 2008; Hawaii, HI, USA. Mark Klerer |
802.20
- 08/13r1 |
Minutes, 802.20 Session #31, 31-18 July, 2008; Denver, CO, USA. Contact: Mark Klerer |
802.20
- 08/12 |
Proposed Annex to ITU-R M.1801 (as submitted to 802.28). Mark Klerer |
802.20
- 08/11 |
Agenda for Session #31, 13-18 July, 2008; Denver, CO, USA. Mark Klerer |
802.20
- 08/10 |
Draft PAR and Five Criteria for 802.20b: "MAC Bridging Support " Contact: Mark Klerer |
802.20
- 08/09r1 |
Minutes, 802.20 Session #30, 11-16 May, 2008; Jacksonville, FL, USA. Contact: Mark Klerer |
802.20
- 08/08 |
Proposed Agenda for Session #30, 11-16 May, 2008; Jacksonville, FL, USA. Mark Klerer |
802.20
- 08/07r3 |
Minutes, 802.20 Session #29, 16-21 March, 2008; Orlando, FL, USA Contact: Chirag Patel |
802.20
- 08/06r2 |
Working Group approved PAR for Management Information Base (MIB) Enhancements and MIB Corrigenda Items. Contact: Mark Klerer |
802.20
- 08/05r1 |
Proposed Agenda for Session #29, 16-21 March, 2008; Orlando, FL, USA. Arnie
Greenspan |
802.20
- 08/04 |
Draft PAR and Five Criteria for 802.20.3 "Standard for Minimum Performance Characteristics of 802.20 Terminals and Base Stations". Editorial Contact: Jerry Upton |
802.20
- 08/03 |
Draft PAR and Five Criteria for 802.20.2 "Standard for Conformance to IEEE 802.20 Systems – Protocol Implementation Conformance Statement (PICS) Pro-forma" . Editorial Contact: Jim
Tomcik |
802.20
- 08/02r2 |
Minutes, 802.20 Session #28, 14-17January, 2008; Taipei, Taiwan. Don Gillies |
802.20
- 08/01 |
Proposed Agenda for Session #28, 14-17 January, 2008; Taipei, Taiwan. Arnie
Greenspan |
802.20 Working Group Documents - 2007 |
802.20
- 07/29r1 |
Minutes, 802.20 Session #27, 16-21 November, 2007; Atlanta, GA, USA. Don Gillies |
802.20
- 07/28 |
Chairs Opening Session Slides, 11-16 November, 2007; Atlanta, GA, USA. Arnie
Greenspan |
802.20
- 07/27 |
Letter Ballot 2m Vote Tally Summary . Arnie
Greenspan |
802.20
- 07/26 |
Proposed Agenda for Session #27, 11-16 November, 2007; Atlanta, GA, USA. Arnie
Greenspan |
802.20
- 07/25r1 |
Letter Ballot 1m Vote Tally Summary . Arnie
Greenspan |
802.20
- 07/24r2 |
Minutes, 802.20 Session #26, 16-21 September, 2007; Waikoloa, HA, USA. Don Gillies |
802.20
- 07/23 |
Chairs Closing Session Slides, 16-21 September, 2007; Waikoloa, HA, USA. Arnie
Greenspan |
802.20
- 07/22 |
Chairs Opening Session Slides, 16-21 September, 2007; Waikoloa, HA, USA. Arnie
Greenspan |
802.20
- 07/21r2 |
Minutes, 802.20 Session #25, 15-20 July, 2007; San Francisco, CA. Don Gillies |
802.20
- 07/20 |
Proposed Agenda for Session #26, 16-21 September, 2007; Waikolia, HA, USA. Arnie
Greenspan |
802.20
- 07/19 |
Chairs Opening Session Slides, July 16, 2007, San Francisco, CA, USA. Arnie
Greenspan |
802.20
- 07/18 |
Minutes of the June 4, 2007, IEEE 802.20 Editorial Team conference call. Mark Klerer |
802.20
- 07/17 |
Approximate text mapping of D2.1 to D0.1m. Prepared by members of the Editorial Group. Contact: Mark Klerer |
802.20
- 07/16 |
Proposed Agenda for Session #25, 15-20 July, 2007; San Francisco, CA. Arnie
Greenspan |
802.20
- 07/15r1 |
Minutes, 802.20 Interim Session, May 14-17, 2007, Montreal, Canada. Revision includes attachments of Attendance Credit and Affiliations. Don Gillies |
802.20
- 07/14 |
ETG (Editorial Group) Task Description. Arnie
Greenspan |
802.20
- 07/13 |
Practice Letter Ballot 2 Development Schedule. Mark Klerer |
802.20
- 07/12 |
Chairs Opening Session Slides, May 14, 2007, Montreal, Canada. Arnie
Greenspan |
802.20
- 07/11 |
Minutes of the May 3, 2007, IEEE 802.20 Editorial Team conference call. Mark Klerer |
802.20
- 07/10 |
Minutes of the April 25, 2007, IEEE 802.20 Editorial Team conference call. Anna Tee |
|
Revised Draft
Minutes, 802.20 Plenary Meeting - Session #23, Orlando, Florida, USA
,
March 12-16, 2007 Jim
Mollenauer |
|
Revised DRAFT
Accelerated Proposed Development Plan, 802.20 Interim Meeting - Session
#22, Orlando, Florida, USA,
March 12-16, 2007 Arnie
Greenspan |
|
Revised Draft
Minutes, 802.20 Interim Meeting - Session #22, London, England, UK,
January 15-19, 2007 Arnie
Greenspan |
|
Chair's Opening
Remarks, 802.20 Plenary Meeting - Session #23, Orlando, Florida, USA,
March 12-16, 2007 Arnie
Greenspan |
|
Five
Criteria for DRAFT PAR Minimum Performance Specifications, 802.20
Interim Meeting - Session #22, London, England, UK, January 15-19,
2007 Arnie
Greenspan |
|
Revised
DRAFT PAR Minimum Performance Specifications, 802.20 Interim Meeting
- Session #22, London, England, UK, January 15-19, 2007
Arnie Greenspan |
|
DRAFT
PAR Minimum Performance Specifications, 802.20 Interim Meeting - Session
#22, London, England, UK, January 15-19, 2007
Arnie Greenspan |
|
DRAFT
Proposed Revisions to Channel Model Document (802.20-PD-08r1), 802.20
Interim Meeting - Session #22, London, England, UK, January 15-19,
2007 Arnie
Greenspan |
|
Draft Minutes,
802.20 Interim Meeting - Session #22, London, England, UK,
January 15-19, 2007 Arnie
Greenspan |
|
DRAFT Accelerated
Proposed Development Plan, 802.20 Interim Meeting - Session #22, London,
England, UK, January
15-19, 2007 Arnie Greenspan |
|
Call for Proposals,
802.20 Interim Meeting - Session #22, London, England, UK,
January 15-19, 2007 Arnie
Greenspan |
|
Chair's Opening
Remarks, 802.20 Interim Meeting - Session #22, London, England, UK,
January 15-19, 2007 Arnie
Greenspan |
802.20 Working Group Documents - 2006 |
|
Revised Draft
Minutes, 802.20 Plenary Meeting - Session #21, Dallas TX, USA,
November 12-17, 2006 Arnie
Greenspan |
|
Revised Draft
Minutes, 802.20 Plenary Meeting - Session #21, Dallas TX, USA,
November 12-17, 2006 Arnie
Greenspan |
|
Draft Minutes,
802.20 Plenary Meeting - Session #21, Dallas TX, USA,
November 12-17, 2006 Arnie
Greenspan |
|
Draft Minutes,
802.20 Interim Meeting - Session #20, Jacksonville Fla, USA, May 15-16 , 2006 Rajat
Prakash |
|
802.20-06/05
Comment Resolution Committee Members |
|
Revised Draft
Meeting Minutes, 802.20 Plenary Meeting - Session #19, Denver, CO,
USA, Mar 06-09, 2006 Rajat
Prakash |
|
Revised Draft
Meeting Minutes, 802.20 Plenary Meeting - Session #19, Denver, CO,
USA, Mar 06-09, 2006 Rajat
Prakash |
|
Comment Resolution
Procedure - Letter Ballot 1, March 7, 2006 Jerry
Upton |
|
PAR Extension
Request Form for March 2006 Plenary Jerry
Upton |
|
PAR Extension
Request Form for March 2006 Plenary Jerry
Upton |
|
802.20-06/01
Draft Meeting Minutes, 802.20 Interim Session #18, Waikoloa Village,
Hawaii, USA, Jan 16-19, 2006 Rajat
Prakash |
|
802.20-06/01
Draft Meeting Minutes, 802.20 Interim Session #18, Waikoloa Village,
Hawaii, USA, Jan 16-19, 2006 Rajat
Prakash |
|
802.20-06/01
Draft Meeting Minutes, 802.20 Interim Session #18, Waikoloa Village,
Hawaii, USA, Jan 16-19, 2006 Rajat
Prakash |
802.20 Working Group Documents - 2005 |
802.20
- 05/09R1
|
Draft Meeting
Minutes, 802.20 Plenary Session #17, Vancouver, Canada, Nov 14-17,
2005 Rajat Prakash |
802.20
- 05/09
|
Draft Meeting
Minutes, 802.20 Plenary Session #17, Vancouver, Canada, Nov 14-17,
2005 Rajat Prakash |
802.20
- 05/08R1
|
Draft Meeting
Minutes, 802.20 Plenary Session #16, Garden Grove, CA, Sept 19-22,
2005 Rajat Prakash |
802.20
- 05/07
|
Draft Meeting
Minutes, 802.20 Plenary Session #15, San Francisco, CA, July 18-21,
2005 Rajat Prakash |
802.20
- 05/06
|
Draft Meeting
Minutes, 802.20 Interim Meeting - Session #14, Cairns, Australia,
May 16-20, 2005 Rao Yallapragada |
802.20
- 05/05
|
Opening Plenary
Slides - Session #14 (2005-05-16) Jerry
Upton |
802.20
- 05/04
|
Draft Meeting
Minutes, 802.20 Plenary Meeting - Session #13, Atlanta, GA, March
14-18, 2005 Rao Yallapragada |
802.20
- 05/03
|
Opening Plenary Slides - Session #13 ( Jerry
Upton (2005-03-14)) |
802.20
- 05/02
|
Draft Meeting
Minutes, 802.20 Interim Meeting - Session #12, Monterey , CA , January
17-20, 2005 (Rao Yallapragada, 2005-01-17)) |
802.20
- 05/01
|
Opening Plenary Slides - Session #12 ( Jerry
Upton (2005-01-17)) |
802.20 Working Group Documents - 2004 |
802.20
- 04/10
|
(Draft) Minutes
of 802.20 Session #11 in San Antonio, Texas, November 15-19, 2004
(Rao Yallapragada, (2004-12-13)) |
802.20
- 04/09
|
Opening Plenary Slides - Session #11 ( Jerry
Upton (2004-11-15)) |
802.20
- 04/08
|
Minutes of 802.20 Session #10 in Berlin, Germany, September 13-16,
2004 (Rao Yallapragada, (2004-9-28)) |
802.20
- 04/07
|
Opening Plenary Slides - Session #10 ( Jerry
Upton (2004-9-12)) |
802.20
- 04/06
|
Minutes of 802.20 Session #9 in Portland, OR, USA, July 12-15, 2004
(Rao Yallapragada, (2004-7-28)) |
802.20
- 04/05r1
|
Minutes of 802.20 Session #8 in Orange County, CA, USA, May 10-13,
2004 (Rao Yallapragada, (2004-5-28)) |
802.20
- 04/04r1
|
Minutes of 802.20 Session #7 in Orlando, FL, USA, March 15-18, 2004
(Rao Yallapragada, (2004-3-28)) |
802.20
- 04/03
|
Opening Plenary Slides
- Session #7 ( Jerry Upton
(2004-3-15)) |
802.20
- 04/02
|
Minutes of 802.20 Session #6 in Vancouver, BC, Canada, January 12-15,
2004 (Rao Yallapragada, (2004-1-29)) |
802.20
- 04/01
|
Opening Plenary Slides
- Session #6 ( Jerry Upton
(2004-1-12)) |
802.20 Working Group Documents - 2003
|
802.20 - 03/22r3
|
Minutes of 802.20 Session #5 in Albuquerque, NM, November 10-14, 2003
(Rao Yallapragada, (2003-11-23)) |
802.20 - 03/21
|
Closing Plenary Slides - Session #5 ( Jerry Upton
(2003-11-13))
|
802.20 - 03/20
|
Opening Plenary Slides - Session #5 ( Jerry Upton
(2003-11-10))
|
802.20 - 03/19
|
Minutes of 802.20 Session #4 in Singapore, September 15-18, 2003
(Joanne Wilson, (2003-11-04)) |
802.20 - 03/18
|
Minutes of 802.20 Session #3 in San Francisco, CA, July 20-25,
2003 (Brian Johnson, (2003-08-17))
|
802.20 - 03/17
|
Coexistence CG To Dos In Making a Recommendation (Contact: Mark Klerer , (09/2003))
|
802.20 - 03/16r1
|
Requirements Topics and Proposals as discussed at Session #4 of
802.20 (Revision 1)(Contact: Mark
Klerer , (09/2003))
|
802.20-03/15
|
CG Requirements Document Version 7a (Contact: Mark
Klerer , (09/2003))
|
802.20 - 03/14
|
Opening Plenary Slides - Session #4 ( Mark
Klerer, Jerry Upton
(2003-09-15))
|
802.20 - 03/13r1
|
Closing Plenary Slides (Modified to reflect the discussion at the
Plenary and supplemented with a composite conference call calendar)
Revision 1 (Changed to reflect input from Executive Commitee regarding
scheduling of conference calls) ( Mark
Klerer, Jerry Upton
(2003-07-28))
|
802.20 - 03/12r1
|
Minutes of 802.20 Session #2 in Dallas, TX, May 12-15, 2003 Rev.
1(Gang Wu, (2003-06-24))
|
802.20 - 03/11
|
DOCUMENT CONTROL NUMBER AND FILE NAMING CONVENTIONS
|
802.20 - 03/10
(PDF)
802.20 - 03/10
(PPT)
|
802.20 Session Closing Slides (Mark
Klerer, Jerry Upton
(2003-05-15))
|
802.20 - 03/09
(PDF)
802.20 - 03/09
(HTML)
|
Call for Contributions on Project 802.20 - Session #2 (Mark
Klerer, Jerry Upton
(2003-04-10))
|
802.20 - 03/08
|
Minutes of 802.20 Session #1 in Dallas, TX, March 10-13, 2003 (Reza
Arefi, (2003-03-17))
|
802.20 - 03/07
|
Session #1 Agenda (Mark Klerer,
(2003-03-10))
|
802.20 - 03/06
|
IEEE 802.20 Session #1: Opening Meeting Slides (Mark
Klerer , (2003))
|
802.20 - 03/05
|
Call for Contributions on Project 802.20 (Mark
Klerer, (2003-02-10))
|
802.20 - 03/04
|
Minutes of 802.20 Meeting #0 in Fort Lauderdale, FL, January 13-16,
2003
(Reza Arefi, (2003-01-22))
|
802.20 - 03/03
|
Proposed Operating Rules for IEEE 802.20 - Overview Presentation
(Mark Klerer, (2003-01-16))
|
802.20 - 03/02
|
MBWA Draft Project Development Timeline (Mark
Klerer, (2003-01-16))
|
802.20 - 03/01
|
Session #0 Draft Agenda 13 January 2003 (Mark
Klerer, (02/11/12))
|
802.20 Working Group Documents - 2002
|
802.20 - 02/02
|
Mobile Broadband Wireless Access Systems: Five Criteria (FINAL)
(02/11/13)
|
802.20 - 02/01
|
Mobile Broadband Wireless Access Systems: Approved PAR (02/12/11)
|
MBWA Executive Committee Study Group Documents
|
802m_ecsg-02/19
|
ECSG MBWA Session #2 Minutes (George
Iritz, 02/11/21)
|
802m_ecsg-02/18
|
Final Agenda of MBWA Session # 2 ((ECSG
- Chair, 02/11/11)
|
802m_ecsg-02/17
|
Uniqueness and the MBWA PAR (Mark
Klerer, 02/11/12)
|
802m_ecsg-02/16
|
The MBWA PAR: Presentation at the Closing Meeting of the IEEE 802
Executive Committee (Mark
Klerer, 02/11/15)
|
802m_ecsg-02/15
|
MBWA and 802.16e: Two Markets - Two Projects
|
802m_ecsg-02/14
|
Response to PAR Comments from 802.16
|
802m_ecsg-02/13
|
Comments from 802.16 on the MBWA PAR
|
802m_ecsg-02/12
|
MBWA ECSG Group Comments on 802.16e PAR
|
802m_ecsg-02/11
|
Mobile Broadband Wireless Access Systems: Five Criteria (MBWA ECSG
Output; Contact Mark Klerer,
02/11/13) REVISED
|
802m_ecsg-02/10
|
Mobile Broadband Wireless Access Systems: Proposed PAR (MBWA ECSG
Output; Contact Mark Klerer, 02/11/13) REVISED
|
802m_ecsg-02/09
|
Minutes of Mobile Broadband Wireless Access Executive Committee
Study Group Session #1;(George
Iritz, 02/10/07)
|
802m_ecsg-02/08
|
Initial Views on the Desired Characteristics of Mobile Broadband
Wireless Access Air Interface (MBWA ECSG Output; Contact Mark Klerer, 02/09/12)
|
802m_ecsg-02/07R1
|
Mobile Broadband Wireless Access Systems: Five Criteria (MBWA ECSG
Output; Contact Mark Klerer,
02/09/10)
|
802m_ecsg-02/06R2
|
Mobile Broadband Wireless Access Systems: Proposed PAR (MBWA ECSG
Output; Contact Mark Klerer,
02/09/11)
|
802m_ecsg-02/05
|
MBWA PAR Approval Process and Initial Project Development Timeline
(ECSG - Chair, 02/09/06)
|
802m_ecsg-02/04 Final
|
Agenda for Mobile Broadband Wireless Access Executive Committee
Study Group Session #1; (ECSG
- Chair, 02/09/010)
|
802m_ecsg-02/03
|
MBWA ECSG Scope and Charter as approved by LMSC Sponsor Executive
Committee; Contact Mark Klerer,
02/08/01)
|
802m_ecsg-02/02
|
Mobile Broadband Wireless Access Systems: Five Criteria (MBWA SG
Output; Contact Mark Klerer,
02/08/01) [Formerly 802.16sgm-02/06
]
|
802m_ecsg-02/01
|
Mobile Broadband Wireless Access Systems: Proposed PAR (MBWA SG
Output; Contact Mark Klerer,
02/08/01) [Formerly 802.16sgm-02/05
]
|
|
|