General Information |
|||
Agenda | 21-May-2019 | Beth Kochuparambil | Cisco |
Closing Business | 23-May-2019 | Beth Kochuparambil | Cisco |
Editor's Report | 21-May-2019 | Matt Brown | MACOM |
Minutes | 16-July-2019 | Kent Lusted | Intel |
Liaison Letters |
|||
OIF to IEEE 802.3 regarding progress on OIF CEI-112G-VSR project and the attachement |
Contributed Presentations - In Presentation Order. |
|||
Proposed insert of Phil's late presentation, "KR Preliminary Draft Report" - See the bottom of this page | |||
Baseline proposal for Receiver Noise Model in COM for KR/CR | 21-May-2019 | Mau-Lin Wu Pei-Rong Li Yuan-Hao Tung |
MediaTek |
Working Towards an ERL Baseline | 21-May-2019 | Rich Mellitz | Samtec |
Backplane COM Analysis for Reference RX Baseline | 16-May-2019 | Howard Heck Subas Bastola Jingbo Li Femi Akinwale Cesar Mendez-Ruiz |
Intel Corporation |
106Gbps LR/BP COM Investigation (IV) | 16-May-2019 | Mike Li Hsinho Wu Masashi Shimanouchi |
Intel |
A Look into Reference Receiver Choice for 100G KR Channels ... (updated for clarity from what was presented) |
16-May-2019 | Upen Reddy Kareti | Cisco |
Proposed insert of Howard's late presentation, "Annex 93A Proposed Updates" - See the bottom of this page | |||
Floating Tap Incorporation Proposal for Annex 93A | 21-May-2019 | Rich Mellitz | Samtec |
2m QSFP-DD Update & Loss Budget Proposal | 21-May-2019 | Alex Haser Tom Palkert |
Molex |
(switched order from posted agenda) Considerations for 802.3ck Test Fixture Specification | 16-May-2019 | Chris DiMinico | MC Communications, PHY-SI LLC, Panduit |
(switched order from posted agenda) 100G CR End-to-End Channel Analysis | 16-May-2019 | Jane Lim Arturo Pachon Pirooz Tooyserkani |
Cisco |
Representing Discontinuities for CR Host Board | 16-May-2019 | Liav BenArtsi David Katz |
Marvell |
Proposed insert of Matt's late presentation, "C2M Preliminary Draft Report" - See the bottom of this page | |||
C2M Simulation Update | 16-May-2019 | Junqing (Phil) Sun Yasuo Hidaka |
Credo Semiconductor |
106Gbps C2M Simulation Updates (III) | 21-May-2019 | Mike Li Hsinho Wu Masashi Shimanouchi |
Intel |
Options for C2M Reference Equalizer ... (updated for clarity from what was presented) |
22-May-2019 | Ali Ghiasi | Ghiasi Quantum LLC |
Proposed insert of Karthik's late presentation, "Reference Receiver Proposal..." - See the bottom of this page | |||
C2M AUI Small Group Update | 16-May-2019 | Kent Lusted | Intel |
Error Statistics Analysis on Cable and Backplane Channels ... Suggested Update (Additional data groups added to slide 6) |
21-May-2019 | Xiang He Sina Naderi Shahi |
Huawei Technologies |
Solutions for Multi-Tap DFE Error Propagation (Summary) | 16-May-2019 | Yuchun (Louis) Lu Yan Zhuang |
Huawei |
100G-CR1/KR1 PCS, FEC and PMA Baseline Proposal | 16-May-2019 | Yan Zhuang Yuchun Lu |
Huawei |
Baseline Proposal for 4-lane Interleaved 100G FEC ... Suggested Update (updated supporter list) |
22-May-2019 | Shawn Nicholl Ben Jones |
Xilinx |
Inverse RS-FEC Sublayer Overview | 16-May-2019 | Mark Gustlin Gary Nicholl Shawn Nicholl |
Cisco Cisco Xilinx |
Next Step on 100G C2C-S and C2C-L | 16-May-2019 | Ali Ghiasi | Ghiasi Quantum LLC |
Channel Models for 100 Gb/s, 200Gb/s, 400 Gb/s C2C AUI | 16-May-2019 | Brandon Gore Richard Mellitz |
Samtec |
Late Contributions |
|||
Alternate 3ck C2M Reference Receiver Proposal -- Held by Chair ... Suggested Updated (updated simulation data) |
19-May-2019 | Karthik Gopalakrishnan Basel Alnabulsi Jamal Riani Ilya Lyubomirsky |
Inphi Corporation |
Annex 93A Proposed Updates | 16-May-2019 | Howard Heck | Intel Corporation |
KR Preliminary Draft Report | 21-May-2019 | Junqing(Phil) Sun | Credo Semiconductor |
C2M Preliminary Draft Report | Matt Brown | MACOM | |
Backplane Observations | 21-May-2019 | Beth Kochuparambil | Cisco Systems |
C2M AUI Channel Grading Proposal | 22-May-2019 | Kent Lusted | Intel |
Link Training Baseline | 23-May-2019 | Jeff Slavick | Broadcom |
Cable Assembly, MTF, and Channel IL | 23-May-2019 | Chris Diminico | MC Communications/PHY-SI LLC/Panduit |