General Information |
|||
Agenda | 16-July-2019 | Beth Kochuparambil | Cisco |
Editor's Report (small editorial update) | 16-July-2019 | Matt Brown | Independant |
Minutes | 26-July-2019 | Kent Lusted | Intel |
Liaison Letters |
|||
Progress on OIF CEI-112G-VSR and CEI-112G-LR projects and the attachement | |||
Proposed Response Then after group edits |
18-July-2019 | Tom Palkert and Mike Dudek |
Contributed Presentations - In Presentation Order |
|||
C2M Simulations with T-Coil model | 11-July-2019 | Ali Ghiasi | Ghiasi Quantum |
C2M simulation updates | 11-July-2019 | Junqing (Phil) Sun | Credo Semiconductor |
100G C2M TP1a Channel/System Analysis | 11-July-2019 | Mark Kimber Ed Frlan |
Semtech |
RX FFE Reference Receiver | 11-July-2019 | Tom Palkert Merrick Brownlee Ryan Latchman |
Macom |
The effect of host trace length on 100G chip to module performance – Updated. | 11-July-2019 | Mike Dudek Tao Hu |
Marvell Semiconductor |
C2M TP1a/TP4 Methodology | 11-July-2019 | Junqing (Phil) Sun Yasuo Hidaka |
Credo Semiconductor |
100G C2M Channel Model Update (Module-to-Host) | 16-July-2019 | Jane Lim Arturo Pachon Pirooz Tooyserkani |
Cisco |
P802.3ck C2M AUI Small Group Update | 11-July-2019 | Kent Lusted | Intel |
Towards Consensus on 100GE CR/KR PCS&FEC&PMA Baseline | 11-July-2019 | Yuchun Lu Yan Zhuang |
Huawei |
Error Statistics Study for 802.3ck Channels | 16-July-2019 | Xiang He Sina Naderi Shahi |
Huawei |
A Dual FEC option for 100GBASE-KR1/CR1 | 11-July-2019 | Mark Gustlin Jeff Slavick |
Cisco Broadcom |
100 Gbps Copper Cable Measurement and S-Parameter File | 16-July-2019 | Nathan Tracy Bruce Champion |
TE Connectivity |
Updated TP1-TP4 QSFP-DD 2m Reach Channel | 11-July-2019 | Tom Palkert Alex Haser Scott Sommers |
Molex |
Representing imperfections for CR Host Board | 11-July-2019 | Liav Ben Artsi David Katz |
Marvell Semiconductor |
Closing CR Baseline Specifications with Signal to Noise Distortion Ratio (SNDR) | 12-July-2019 | Rich Mellitz | Samtec |
100G C2C-S Channel Estimate | 16-July-2019 | Jane Lim Arturo Pachon Pirooz Tooyserkani |
Cisco |
Baseline Proposal Cable assembly, Host, MTF, and Channel Insertion Loss | 11-July-2019 | Chris DiMinico | MC Communications/PHY-SI LLC/Panduit |
Streamlining P802.3ck MDIs | 17-July-2019 | Nathan Tracy | TE Connectivity |
Backplane Reference Receiver Baseline (allowed editorial changes) | 17-July-2019 | Howard Heck | Intel |
106Gbps Ethernet LR COM Investigation (V) | 17-July-2019 | Mike Li Hsinho Wu Masashi Shimanouchi |
Intel |
Effects of Non-ideal Equalizer Coefficients on COM | 17-July-2019 | David Rennie | Synopsys |
Baseline Proposal for 100, 200, and 400 Gb/s Backplane | 17-July-2019 | Clint Walker | Alphawave IP |
P802.3ck C2C AUI Small Group Update | 11-July-2019 | Kent Lusted | Intel |
100G CR End-to-End Channel Analysis Updates | 16-July-2019 | Jane Lim Arturo Pachon Pirooz Tooyserkani |
Cisco |
How to Proceed on C2C Application | 11-July-2019 | Ali Ghiasi | Ghiasi Quantum |
Late Contributions |
|||
Update to Orthogonal Channels | 17-July-2019 | Upen Reddy Kareti | Cisco |
P802.3ck C2M AUI Challenges | 17-July-2019 | Kent Lusted | Intel |
100GEL MTF Measurements | 17-July-2019 | Sam Kocsis | Amphenol |
Potential Issues and Solution of Dual FEC option for 100GBASE-KR1/CR1 | 17-July-2019 | Yuchun Lu Yan Zhuang |
Huawei |
Baseline Proposal Cable Assembly, Host, MTF, and Channel Insertion Loss | 18-July-2019 | Chris Diminico | MC Communications/PHY-SI/Panduit |
Proposed Timeline | 18-July-2019 | Beth Kochuparambil | Cisco |